My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/10/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 06/10/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2025 10:01:01 AM
Creation date
6/9/2025 9:20:00 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/10/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGNEYCONSTRUCTION <br />1 II <br />COMMERCIAL Cr INDUSTRIAL CONTRACTORS <br />1401 Park Road - Chanhassen, MN 55317 <br />www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name <br />AE2S <br />Proposal <br />From <br />Noah Pundsack <br />Attention <br />Ryan Hanson <br />Date <br />3/28/2025 <br />E-mail Phone <br />Ryan.Hanson@AE2S.com (612) 220-0154 <br />Magney Proposal No. 036 <br />EIFs Base Flashing <br />El Urgent <br />Total pages, including cover: <br />Please comment <br />6 <br />X❑ Please review <br />COMMENTS <br />For your information <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />Ryan, <br />Magney Construction, Inc. is pleased to present the following quotation to furnish the necessary labor, <br />material, and equipment to provide EIFs Base flashing between the base of the EIFs panels and the top of <br />the Concrete faced insulation panels on the reservoir. The Flashing will help to prevent moisture from <br />running down the base of the EIFs and getting behind the concrete faced insulation panels. See the costs <br />associated with change are summarized below. Associated with RFI - 056. <br />Labor: <br />Equipment: <br />Equipment: Misc. Small Tools And Equipment (10% of Labor) <br />Subcontractor: Landmark Stucco EIFs Bottom Flashing <br />Subtotal <br />General Contractor's Overhead <br />Bond & Insurance premiums <br />5,190.00 <br />5,190.00 <br />259.50 <br />81.74 <br />Lump Sum Total: <br />$ 5,531.24 <br />Additional Calendar Days Required for this Change <br />Including material lead time <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, <br />ri.,%eJ/,,,r <br />Noah Pundsack <br />Project Engineer <br />Accepted By Date <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.