Laserfiche WebLink
PREFINISHED MTL. PARAPET CAP <br />WITH BLOCKING AS REQUIRED <br />DRAINABLE EIFS WALL SYSTEM - <br />WEATHER BARRIER - <br />3/4" PLYWOOD SHEATHING - <br />6" MTL. FRAMING AS REQUIRED. INFILL • <br />CAVITY WITH MINERAL WOOD INSULATION • <br />2" NAIL BASE INSUALTION • <br />60 MIL EPDNI ROOFING - UP AND OVER PARAPET • <br />LAP HOT -MOPPED WATERPROOFING OVER <br />WALL WATERPROOFING MIN. 6" - TYP. <br />ANODIZED ALUM. WALL MOUNTED CITY <br />LOGO AND SIGNAGE - SEE RESERVOIR <br />ELEVATIONS FOR MORE INFORMATION <br />DRAINABLE EIFS WALL SYSTEM • <br />WATERPROOFING - <br />C.I.P. CONCRETE TANK WALL - • <br />SEE STRUCTURAL• <br />EXTEND CONCRETE FACED INSULATED WALL <br />PANEL BELOW GRADE <br />CONCRETE FACED INSULATED WALL PANEL • <br />WATERPROOFING • <br />C.I.P. CONCRETE TANK WALL - • <br />SEE STRUCTURAL• <br />PROTECTION BOARD • <br />2" RIGID INSULATION • <br />WATERPROOFING • <br />C.I.P. CONCRETE FOUNDATION WALL-• <br />SEE STRUCTURAL • <br />LAP WATERPROOFING <br />MEMBRANE OVER BENTONITE <br />WATERPROOFING - TYP. <br />BENTONITE CLAY WATERPROOFING <br />AT LOWER PUMP LEVEL AND ALL <br />BELOW GRADE TANKS <br />INSULATED ALUI <br />COUN1 <br />ME <br />• BALLASTED 60 MIL EPDNI ROOFING <br />• TAPERED INSULATION (1/4" PER FOOT) <br />- 5.2" MIN. BASE LAYER(S) POLY -ISO INSULATION <br />- HOT -MOPPED WATERPROOFING <br />• C.I.P. CONCRETE LID - SEE STRUCT. <br />BUILDING <br />WELL ACCESS <br />108' 0" <br />CONC. <br />BALLASTED 60 MIL. <br />TAPERED INSULATION <br />5.2" MIN. BASE LAYER(S) POLY - <br />HOT -MOPPED W <br />C.I.P. CONCRETE LI[ <br />MAIN LEVEL <br />RE-INFORCED CONCRETE MAT SLAB - <br />[ <br />SEE STRUCTURAL <br />III <br />lull IIIIII Ilii1111ii II-IIIl <br />I I-11 - - - 1-1 I <br />TYP RESERVOIR WALL <br />SCALE <br />PUMINN G/HOLDINGTANK <br />93- 0" <br />