Laserfiche WebLink
MpGNEY C 0 N 5 T R <br />dvitiiQAL b IlVUU1 <br />U C T I 0 N <br />tilAt. LUN I NAL i Ulib <br />Request for Information No. 056 <br />4 4 1401 Park Road - Chanhassen, MN 55317 <br />www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br />Ramsey Water Treatment Plant <br />City of Ramsey, MN <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />General Contractor: <br />Magney Construction, Inc. <br />1401 Park Road <br />Chanhassen, MN 55317 <br />Engineer: <br />AE2S <br />6901 E Fish Lake Road <br />Maple Grove, MN 55369 <br />Date Created: 03/28/2025. <br />1 <br />1 <br />Author: Noah Pundsack <br />Company: Magney Construction, Inc. <br />Reference: EIFs <br />Drawing Number: <br />Specification 07 24 00 <br />Question: <br />Date Required: 04/04/2025. <br />Our EIFs contractor noticed when putting together their materials order that no flashing is included in <br />between Base of the EIFs and the concrete faced insulation panels on the bottom of the Reservoir. The <br />flashing would help to prevent moisture from running down the Base of the EIFs getting behind the concrete <br />faced insulation. <br />Should the Flashing be required it would include additional costs. <br />See attached drawings, cost and colors selection for reference. <br />Please see attached and advise. <br />Answer: <br />Date Answered: <br />Answered by: <br />