Laserfiche WebLink
LANDMARK <br />LANDMARK STUCCO INC. <br />16744 Co Rd 151 <br />Avon, MN 56310 <br />320-267-8199 <br />Customer: Magney Construction <br />Project: Ramsey Water Treatment Plant <br />Base Flashing CO #1 <br />1) Recital: Change Order #1 regards extra scope of work for labor and material of base flashing <br />Labor and Materials at Ramsey Water Treatment Plant. Change Order amount is in addition to <br />current contract price. Landmark Stucco Inc. acknowledges the project pricing is the prevailing <br />wage base. <br />2) Extra Scope of work includes: <br />❑ . Labor to install 436 LF of base metal flashing. <br />❑ . Metal flashing is to be incorporated into the Dryvit Backstop WRB as system specified. <br />❑. Total Labor- $3,040.00 <br />❑ . Materials provided for all sill flashing in the ACM and siding areas. <br />❑ . 440 LF of Firestone metal- architects choose of color <br />❑ . Fasteners <br />❑ . Mesh tape and textured Backstop WRB <br />❑ . Total Materials- $2,150.00 <br />Total Change Order Amount not to exceed: $5,190.00 (Five Thousand One Hundred Ninety <br />Dollars) <br />Payment as follows: per contract AIA. <br />Landmark Representative: Jesse Latterell Date: 3-28-2025 <br />