Laserfiche WebLink
AGL\YCON5TRUCTION <br />COWER., 6 INDUSTRIAL CONTRACTORS <br />4 1401 Park Road - Chanhassen, MN 55317 <br />www.mag�construction.com 952.474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name <br />AE2S <br />Proposal <br />From <br />Noah Pundsack <br />Attention <br />Abby Bowman <br />Date <br />4/29/2025 <br />E-mail Phone <br />Abigail.Bowman@AE2S.com (763) 463-5036 <br />Magney Proposal No. 037 <br />Filter Room Masonry Wall Fix <br />Urgent Please comment <br />Total pages, including cover: 1 <br />COMMENTS <br />111 Please review <br />nFor your information <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />Abby, <br />Magney Construction, Inc. is seeking compensation for the additional labor, material, and equipment required <br />to complete the changes required to cut the filter room masonry walls and add in four angle iron supports <br />anchored into the precast walls. This correction is due to a bust in the architectural drawings causing the <br />masonry walls and precast walls to extend into each others space. See the costs associated with change <br />summarized below. <br />Labor: Additional Labor To Set Scaffold And Cut Masonry Walls $ 4,987.20 <br />Material: Dispose Of Masonry Block, Consumable Tools/Blades, Angle Iron & $ 2,534.88 <br />Anchor Screws <br />Equipment: Crane To Swing Scaffold And Material To Upper Level $ 1,057.35 <br />Equipment: Misc. Small Tools And Equipment (10% of Labor) $ 498.72 <br />Subcontractor: <br />Subtotal <br />General Contractor's Overhead <br />Bond & Insurance premiums <br />9,078.15 <br />1,361.72 <br />156.60 <br />Lump Sum Total: <br />10,596.47 <br />Additional Calendar Days Required for this Change (Including material lead time): <br />0.0 <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, <br />• 1, :f <br />Noah Pundsack <br />Project Engineer <br />Accepted By Date <br />Page 1 of 1 <br />