My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/24/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 06/24/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 10:50:21 AM
Creation date
6/24/2025 10:34:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/24/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: <br />06/24/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />5. 12. <br />Title: <br />Adopt Resolution #25-139 Ordering Plans and Specifications for Flintwood Hills 2nd & 3rd Street <br />Reconstructions, Improvement Project #26-05 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #25-139 ordering plans and specifications for Flintwood Hills 2nd <br />& 3rd Street Reconstructions, Improvement Project #26-05. <br />Background: <br />The 2025 — 2034 Capital Improvement Plan (CIP) identifies the streets within the Flintwood Hills 2nd & 3rd <br />subdivision for street reconstruction in 2026. A street segment summary for the project is attached to this case. <br />Project History <br />• On April 22, 2025, the Ramsey City Council adopted Resolution #25-082, accepting and awarding a <br />proposal to Bolton & Menk for topographic survey of the project area. <br />• May 13, 2025, the Ramsey City Council adopted Resolution #25-101, accepting and awarding a proposal <br />to Independent Testing Technologies for a geotechnical report of the project area. <br />• June 17, 2025, the Ramsey Public Works Committee recommended City Council order plans and <br />specifications for said improvements. <br />Project Scope <br />This project proposes to reconstruct the streets within the Flintwood Hills 2nd & 3rd subdivision, generally located <br />east of Dysprosium Street between CSAH 116 and Nowthen Boulevard (CSAH 5). The subdivision does also <br />include 142nd Avenue west of Dysprosium Street up to Flintwood Park. The streets are 30-foot wide urban <br />section with concrete curb and gutter, totaling 0.83 miles in length. There is no sidewalk in the subdivision other <br />than the intersections with Dysprosium Street. Any pedestrian ramp updates would be tied to Dysprosium Street, <br />rather than this project. Traffic counts have not been taken within the project area. Municipal sewer, water, and <br />storm sewer exist within the project area. Utility testing will be performed during project design, utility <br />improvements are not currently proposed. Storm sewer catch basin grouting and casting resets are typically <br />performed with reconstruction projects. <br />The streets within Flintwood Hills 2nd & 3rd were constructed between 1985 and 1987, no overlay has been <br />performed on these streets. Ground Penetrating Radar (GPR) data taken prior to skim patching shows an average <br />pavement section of 6.6-inches, including 2.5-inches of bituminous and 4.1-inches of aggregate base. <br />The reconstruction is proposed to be a Full Reconstruction in the CIP. A Full Reconstruction typically includes <br />replacing the concrete curb and gutter, and building back a full street section. This causes for greater impacts to <br />adjacent boulevards and driveways, but all work will still be within the City -owned right of way. During project <br />design, staff will review the existing concrete curb and gutter to determine if spot replacement would be sufficient. <br />However, based on the GPR data there's not a thick enough existing pavement section to perform a typical FDR <br />improvement, which will require additional subgrade excavation to create enough depth for the typical <br />neighborhood pavement section. A Full Reconstruction is generally 30 to 40-percent more expensive than an <br />FDR project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.