My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/24/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 06/24/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 10:50:21 AM
Creation date
6/24/2025 10:34:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/24/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minnesota Department Of Transportation <br />Report Printed Date: 6/5/2025 <br />Contract: 230502 <br />Prime Contractor: Ames Construction, Inc., 0000207855 <br />CO Type: COLevel2 <br />State Proj. No.: 0202-116 <br />Fed. Proj. No.: 0010340 <br />District: M Metro <br />Reason: 1402.5 Extra Work <br />Location: CSAH 56 (RAMSEY BLVD.) AND CSAH 57 (SUNFISH LAKE BLVD.) OVER T.H. 10 AND BNSF RAILWAY IN ANOKA AND RAMSEY. <br />Description: Ramsey Blvd & 143rd Ave Sanitary Sewer Extra Work <br />Explanation: <br />Issue <br />Change Order No.: 0043 <br />Awarded Contract Amount: $99,848,562.81 <br />Resident Engineer: Dan Penn <br />Admin Office: MC -Golden Valley North West <br />County: C002 ANOKA Route: CSAH 56, 57 <br />Net Change Order Amount: $32,982.21 <br />Spec Book Year: 20 <br />Funding Source: SA <br />According to the plan, the proposed sanitary sewer work on Ramsey Blvd includes a new section of 8" PVC that connects into proposed MH 10. The existing section of <br />sanitary sewer from MH 10 to MH 149 is to remain in place with MH 149 being re -constructed. However, after reviewing in the field, the City of Ramsey directed the <br />contractor to remove and replace the section of sanitary from MH 10 to MH 149, under the assumption that this section of sanitary sewer was unsuitable. However, once <br />the contractor excavated and exposed this section of existing sanitary sewer, the City of Ramsey determined it was suitable and did not need to be replaced. <br />Resolution Due to the Contractor having already ordered and received the sanitary sewer material, installed well points and performed additional dewatering as well as began <br />excavation in order to complete the work, the contractor will be compensated for the labor, equipment and material they had into the extra work before it was determined it <br />was no longer needed. The City of Ramsey will take possession of the additional sanitary sewer material. <br />Entitlement The Engineer and City of Ramsey have determined the contract needs to be revised in accordance with MnDOT Specification 1402.5 Extra Work and 1907 Surplus <br />Material. <br />Impact This change does not impact contract time. This change order covers the known and anticipated costs and contract time adjustment (if any) attributable to the work <br />covered by this Change Order. If the Contractor incurs unknown and unanticipated additional work that affects costs or impacts the critical path, the contractor reserves the <br />right to request an adjustment to the contract amount or contract time in accordance with MNDOT 1402. <br />Cost The Engineer and City of Ramsey have reviewed and approve the costs associated with this change. <br />Payment Payment for the additional work and material will be made at a lump sum. <br />Increases/Decreases <br />Item Description <br />Item ID Line Line Project <br />Project Contract Quantity <br />Category Item Source Inc/Dec Unit Unit Price Dollar Amount <br />Total: <br />$0.00 <br />Contract: 230502 <br />Change Order No.: 0043 <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.