My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/24/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 06/24/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 10:50:21 AM
Creation date
6/24/2025 10:34:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/24/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AND STAGING AREAS: Contractor shall confine their work activities within the right <br />of way at all times. No equipment shall be left on city streets outside normal working hours. <br />TRAFFIC CONTROL: Contractor will be required to follow the most current edition of the <br />Temporary Traffic Control Zone Layout Manual. <br />SPECIFICATION REFERENCES: Contractor shall conduct all work in conformance with the <br />specifications set forth herein and in accordance with the most current edition of the Minnesota <br />Department of Transportation Standard Specifications for Construction, which is incorporated by <br />reference to these specifications. <br />PAYMENT: Invoices must be submitted to the city on a net 30-day basis, made out to the City of <br />Ramsey Engineering Department, including the project description and must be submitted via <br />email to accountspayable(a,cityoframsey.com. Payments may be made by EFT upon request. <br />Please submit EFT requests to accountspayable(u,cityoframsey.com. An IC134 form will be <br />required for the final payment. <br />BASIS OF PAYMENT: Payment shall be made for all components of the work as specified in <br />this RFP. The cost of any additional equipment, labor, materials, permits, tools, and supplies <br />which have not been specifically identified in this RFP for payment, but are required to complete <br />the work, shall be considered incidental to the project. <br />3 <br />RFP — 2025 MSA PAVEMENT MARKING IMPROVEMENTS <br />CITY IMPROVEMENT PROJECT #25-1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.