Laserfiche WebLink
Alternative A <br /> <br />Cost to Connect to City of Anoka Storm Sewer <br /> <br />2 ea. Std. 48" Storm MH'S ~ 1400/ea. $2,800 <br />1 ea. 24"FES ~ 750/ea. 750 <br />650 ft. 24" RCP ~ 30/ff. 19,500 <br /> $23,050 <br /> <br />Driveway restoration 550" x 28''= 1720 sq. yds. <br /> <br />1720 yd2 Remove Bit. ~ $1/sq. yd. $1,720 <br />535 ton Class 5 (6" dp.) ~$7.50/ton 4,013 <br />362 ton Bit. (3.5" dp) ~35/ton 12,670 <br />40 ft. C & G ~ $10/ft. 400 <br /> <br />$18,803 <br /> <br />Total Construction $41,853 <br />Overhead ~ 30% 12,556 <br />Total Cost $54,409 <br /> <br /> <br />