Laserfiche WebLink
1 ea. <br />476 ft. <br />1 ea. <br />64 ft. <br />LS <br />LS <br /> <br />Alternative B <br /> <br /> Cost to Provide Overflow <br />to Sunfish Lake Storm Sewer <br /> <br />24" FES <br />24" RCP <br />48" storm manhole <br />B&J casting pipe <br />Traffic Control <br />Gravel Drive Restoration <br /> <br />750/ea. $ 750 <br />30/f~. 14,280 <br />1400/ea. 1,400 <br />375/ft. 24,000 <br />1,ooo Looo <br />2,500 2,500 <br /> <br />Construction Cost $43,930 <br />Overhead @ 10% 4,390 <br />Total Cost $48,320 <br /> <br />*Staking and inspection only. Since construction plans have been prepared. <br /> <br />Agreement Credits District $102,500 for overflow <br /> <br /> <br />