My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 06/12/2025
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2025
>
Agenda - Parks and Recreation Commission - 06/12/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 4:30:31 PM
Creation date
7/10/2025 3:52:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
06/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br />6/4/2025 <br />Page 5 <br />• Prepare Design Development (65%) drawings addressing the following: Public space and <br />water play layout and materials <br />• Pedestrian circulation <br />• Interpretive elements <br />• Stormwater management <br />• Site/shade rentable structures <br />• Site lighting <br />• Site furnishings & fencing <br />• Artistic elements <br />• Planting design <br />• Grading and drainage <br />• Utility relocations (as needed) <br />1. Prepare plans, cross sections, and construction details. <br />2. Finalize material selections. <br />3. Prepare preliminary technical specifications. <br />4. Conduct city staff and agency coordination, and quality control review on the 65% set of <br />drawings and specifications. <br />5. Provide necessary agency review and city submittal documents. <br />6. Refine drawings and specifications based on project coordination, city and agency review. <br />Meetings <br />■ Bi-weekly city staff meetings (2 in person / 4 virtual) <br />■ Stakeholder, agency and project partner meetings (as needed) <br />Deliverables <br />■ Design Development (65%) package - plans, sections, elevations, construction details, and <br />specifications <br />■ Meeting notes <br />TASK 3 — CONSTRUCTION DOCUMENTATION (95%) <br />Upon approval of design development documents, we will prepare construction documents and <br />technical specifications for all site design elements approved in the design development phase of the <br />work. Specific tasks will include the following: <br />Services: <br />1. <br />Prepare Construction Document (95%) drawings addressing the following: <br />• Public space and water play <br />layout and materials <br />• Placemaking and public art <br />opportunities <br />• Pedestrian circulation <br />• Interpretive elements <br />• Stormwater management <br />2. Prepare plans, cross sections, and construction details. <br />3. Prepare final technical specifications. <br />• Site/shade structures <br />• Site lighting <br />• Site furnishings & fencing <br />• Planting design <br />• Grading and drainage <br />• Utility relocations <br />DAMON FARBER '10 S 4th Ave, Suite 7050 Minneapolis, MN 55415 <br />
The URL can be used to link to this page
Your browser does not support the video tag.