Laserfiche WebLink
WATER FEATURE COSTS <br />i.e; <br />0 <br />v <br />ca <br />01 <br />_ <br />• <br />0 <br />CD <br />>- + <br />XI <br />a.) <br />11 <br />cu <br />to <br />= <br />ea <br />a <br />73 <br />c.4 <br />E <br />as <br />-43 <br />a' <br />co <br />a.) <br />a. <br />ea <br />a) <br />0) <br />ea <br />0 <br />N <br />N <br />0 <br />V <br />> Size of the Water Feature <br />> Equipment and Filtration System <br />CD <br />E <br />a) <br />+ -, <br />> u, <br />v <br />+ <br />O 0 <br />L � <br />c >, <br />U -0 D <br />0 O <br />C (l) <br />E o <br />(3 c <br />0) s <br />O <br />o- J <br />A A <br />> Construction Materials <br />> Amenities <br />> Bidding Climate & Number of Bidders <br />THE WATERFRONT / 12 / 14 / 2023 <br />