o Performance Indicator: Reduce blighted properties along Hwy 10 <br />o Completion Timeframe: Q4 2025 <br />• Objective 3: Rehabilitate Historic Townhall <br />o Responsible Parties: Economic Development (Sullivan, Hanson) <br />o Key Areas: Historic Townhall <br />■ Action 2.1: Complete preliminary design of rehabilitation improvements <br />■ Action 2.2: Apply for large grant opportunity <br />■ Action 2.3: Apply for small grant opportunities if needed <br />■ Action 2.4: Identify user/renter <br />o Performance Indicator: Acquire grant funds to fund remaining allowed construction <br />costs <br />o Completion Timeframe: Q1 2026 <br />Strategy 5. Improve the safety and mobility of transportation corridors <br />• Objective 1: Improve street lighting and pedestrian facilities <br />o Responsible Parties: Engineering, Public Works (Westby) <br />o Key Areas: Existing and future roadways and pedestrian facilities <br />■ Action 1.1: Evaluate and construct street lighting improvements <br />■ Action 1.2: Evaluate and construct pedestrian trail safety improvements <br />o Performance Indicator: Reduction in reported safety concerns <br />o Completion Timeframe: Ongoing <br />Strategy 6. Connect the community through parks, trails and recreational <br />programming <br />• Objective 1: Construct Phase 1 of The Waterfront Park <br />o Responsible Parties: Parks Division (Riverblood) <br />o Key Areas: COR Community Park and Downtown Destination <br />■ Action 1.1: Approve schematic design work of water play area and future <br />community building June 10, 2025 <br />■ Action 1.2: Authorize preparation of plans/specs August 12, 2025 <br />■ Review comparative case studies of comparable community <br />buildings/parks <br />■ Review comprehensive proforma of The Waterfront Park (revenue/O&M <br />costs) <br />■ Identify funding and community benefits <br />■ Approve schematic design and phasing plan <br />■ Action 1.3: Approve plans/specs and authorize bids September 2025 (3 month <br />process) <br />■ Action 1.4: Award contract January 2026 <br />o Performance Indicator: Water play open July 1, 2026 <br />• Completion Timeframe: Phase 1 completed Q2 2026 <br />10 <br />