My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 07/22/2025
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2025
>
Agenda - Council Work Session - 07/22/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 2:37:17 PM
Creation date
7/17/2025 3:30:26 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
07/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Magney would like to clarify that the "Impact of winter concrete was not fully anticipated" DUE TO <br />THE DELAY THAT OCCURRED AT THE START OF THE PROJECT. <br />b. Additional material and subcontractor delays include; <br />i. Below grade concrete and foundation work that was slowed due to the original delay, impacted <br />all trades. If this were a skyscraper, you cannot work on the penthouse before the lower floors <br />are completed. <br />ii. We are still working through design and finishes decisions. <br />5. Magney wishes to continue our strong partnership through the end of this project and beyond. We believe <br />it is in the best interest of the City and of the project to approve the time extension and engineering <br />amendment. <br />6. AE2S' engineering amendment #3 equates to only 0.5% of the construction costs for this project. <br />Below are several bullet points staff feel are important considerations related to these requests. <br />• Change Order #3 only requests additional time, not additional funding. <br />• Approving Change Order #3 would result in the Substantial Completion date being revised from July 28, <br />2025, to October 15, 2025, and the Final Completion date being revised from October 28, 2025, to <br />December 31, 2025. <br />• The requested time extensions would not adversely impact municipal water users as water use is not in high <br />demand during Fall and Winter months. <br />• The requested time extensions would dovetail well with Fall watermain flushing. <br />• The funds requested in Engineering Amendment #3 are to cover costs for AE2S staff during the 2'/2-month <br />time extension approved with Change Order #2, as well as for the time extension requested in Change <br />Order #3. <br />Representatives from both Magney and AE2S are planning to attend this meeting. <br />Recommendation: <br />The contractor will not be able to meet the current Substantial and Final Completion deadlines. if Change Order <br />#3 is not approved, the contractor and/or their subcontractors will likely complete their work hastily and will <br />likely seek less coordination and/or direction from AE2S and city staff to minimize potential liquidated damages. <br />This could result in the need to make future modifications to the WTP that may cost more than the requests as <br />presented. City staff therefore support approving Change Order #3 and Engineering Amendment #3 to ensure the <br />water treatment plant project contractor will complete the project in an orderly manner, and that the project <br />engineer is able to provide adequate inspections and representation on behalf of the city through the end of <br />construction. <br />Outcome/Action: <br />Dependent on discussions. Formal cases requesting approval of Change Order #3 and Engineeering Amendment <br />#3 will be presented during the regular City Council meeting this evening. <br />July 8, 2025 CC case <br />AE2S New Slides <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Hagen Brian Hagen 07/17/2025 03:06 PM <br />Form Started By: Bruce Westby Started On: 07/16/2025 04:17 PM <br />Final Approval Date: 07/17/2025 <br />