My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 07/22/2025
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2025
>
Agenda - Council Work Session - 07/22/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 2:37:17 PM
Creation date
7/17/2025 3:30:26 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
07/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: <br />07/08/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />7. 2. <br />Title: <br />Adopt Resolution #25-128 Approving Change Order No. 3 and Engineering Amendment No. 3 for Improvement <br />Project #21-09, Centralized Water Treatment Plant <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #25-128 approving Change Order No. 3 and Engineering <br />Amendment No. 3 for Improvement Project #21-09, Centralized Water Treatment Plant. <br />Background: <br />Advanced Engineering and Environmental Services, Inc. (AE2S) was hired by the City of Ramsey to design and <br />prepare final plans and specifications for the Water Treatment Plant (WTP). AE2S was also hired by the city to <br />provide construction services during construction. <br />Magney Construction, Inc. (Magney) was awarded the construction contract for construction of the WTP. <br />When the project was bid, bid alternate #1 was added in response to comments received from contractor's during <br />the pre -bid meeting that the project schedule was very tight and that adding several months to the project schedule <br />may help reduce bid prices since contractors tend to increase their bid prices if they have concerns that liquidated <br />damages may be assessed if completion deadlines are not met. Magney therefore submitted a bid deduction for <br />bid alternate #1 in the amount of -$50,000 based on a 28-month construction schedule versus a 24-month <br />schedule per the base bid. When the city awarded the contract for construction, only the base bid was awarded <br />meaning Magney has 24-months to complete the project. <br />During construction, the city approved 2 Change Orders and 2 Engineering Amendments as follows. <br />• Change Order #1 — Increased project costs $794,153.71 to apply prevailing wages so awarded grant funds <br />could be used. <br />• Change Order #2 — Extended completion dates by 88 days due to delays in obtaining DOLI and building <br />permits. No cost increase was associated with this CO. <br />• Engineering Amendment #1 — Increased construction services fees $225,100 due to construction schedule <br />extension. <br />• Engineering Amendment #2 — Increased construction services fees $2,683.15 due to building permit <br />requirement for as -built survey. Also included $14,640.69 for engineering services due to plan revisions <br />needed to address new DOLI code and city site plan review process. <br />City staff met with and held numerous conversations with staff from AE2S and Magney Construction regarding <br />Change Order No. 3 and Engineering Amendment No. 3. City staff felt there were generally three options for <br />moving forward with these requests, as follows. <br />• Option #1 — Present Change Order #3 and Engineering Amendment #3 as is and request City Council <br />approval. <br />• Option #2 — Agree to a more equitable distribution of costs across all parties resulting from these requests. <br />• Option #3 — Leave the schedule as is and apply liquidated damages through the contract, if needed. <br />City staff expressed that the city has endured significant project delays and cost increases during this project, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.