My WebLink
|
Help
|
About
|
Sign Out
Home
Ramsey 2040 Comprehensive Plan No Appendices (2)
Ramsey
>
Public
>
Comprehensive Plan
>
Ramsey 2040 Comprehensive Plan No Appendices (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2025 9:15:37 AM
Creation date
9/3/2025 9:12:08 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
53 <br /> <br /> <br /> <br />Metropolitan Council Submission <br />Transportation Background <br />The City of engaged the services of WSB to complete a Transportation Plan on behalf of the City. <br />The Transportation Plan is included in the Comprehensive Plan Update by reference. <br />Transportation Priorities <br />Ramsey has several transportation priorities highlighted in the Transportation Plan. Detailed <br />planning efforts are planned for each of these main corridors. <br />• Highway 10 <br />• Highway 47 <br />• Mississippi River Crossing <br />• Nowthen Boulevard <br />• Armstrong Boulevard <br />• Green Valley Road <br />• 181st Avenue <br />Ramsey hopes to have Corridor Plans completed for each of these corridors by 2023. <br />Introduction <br />The transportation system in Ramsey generally operates well today. The city’s multimodal <br />transportation system includes facilities for vehicles, freight, walking, bicycling and transit. <br />Facilities are operated by a number of agencies, including the City of Ramsey, Anoka County, the <br />Minnesota Department of Transportation (MnDOT), Metro Transit, and the Burlington Northern <br />Santa Fe (BNSF) Railway. <br />This transportation chapter has been prepared in compliance with State of Minnesota Statutes and <br />applicable Metropolitan Council guidelines. As part of this Plan, the city has reviewed existing and <br />This transportation plan includes the following information: <br />1. Summary of Regional Strategies <br />2. Existing Roadway System <br />3. 2040 Traffic Forecasts and Roadway Network Planning <br />4. Existing and Planned Non-Motorized Transportation Network <br />5. Freight Network <br />6. Transit <br />7. Aviation <br />8. Goals and Multimodal Strategies <br />9. Proposed Short and Long Range Roadway Projects <br />10. Public Comments <br />11. Conclusion and Next Steps <br />
The URL can be used to link to this page
Your browser does not support the video tag.