My WebLink
|
Help
|
About
|
Sign Out
Home
Haviland Fields Environmental Assessment Worksheet
Ramsey
>
Public
>
Planning
>
Haviland Fields Environmental Assessment Worksheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2025 10:10:37 AM
Creation date
9/3/2025 9:20:07 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
With additional background traffic growth, the study area intersections are projected to experience some <br />change in delay, with some of movements and approaches projected to operate at a lower LOS as <br />compared to the Opening Year (2027) No -Build Conditions. The network is expected to need new signal <br />timings in order to operate at an acceptable level of service. Specifically, the stoplight at MN-47 & Sunwood <br />Drive may need protected left turn phases in order for the left turn movements to operate at a LOS of D or <br />better. <br />The SinnTraffic reports are provided in Appendix D. <br />HORIZON YEAR (2040) BUILD CONDITIONS <br />The Horizon Year (2040) Build traffic volumes were developed from the addition of the Horizon Year (2040) <br />No -Build volumes in Exhibit 5 and the Site Trips in Exhibit 7. Exhibit 9 shows the Horizon Year (2040) Build <br />turning movement volumes. The site accesses were modeled as side street stop control. The results of the <br />analysis are provided in Table 7. <br />Haviland Fields - Ramsey, MN <br />Traffic Impact Analysis I July 2023 <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.