Laserfiche WebLink
4. Reason for EAW Preparation <br />Check one: <br />Required: Discretionary: <br />EIS Scoping ❑Citizen petition <br />Mandatory EAW RGU discretion <br />El Proposer initiated <br />If EAW or EIS is mandatory, give EQB rule category subpart number(s) and name(s): <br />Minnesota Rules, part 4410.4300, subpart 19: Residential development <br />5. Project Location <br />County: Anoka <br />City/Township: Ramsey <br />PLS Location (1/4,1/4, Section, Township, Range): SE 1/4, NW 1/4, Section 25, Township 32N, <br />Range 25W <br />Watershed (81 major watershed scale): Rum River <br />GPS Coordinates: 45.235108, -93.402587 <br />Tax Parcel Number: 253225240059 <br />At a minimum, attach each of the following to the EAW: <br />• County map showing the general location of the project (see Figure 1) <br />• US Geological Survey 7.5 minute, 1:24,000 scale map indicating project boundaries <br />(see Figure 2) <br />• Site plans showing all significant project and natural features. Pre -construction site <br />plan and post -construction site plan (see Figure 3 and Appendix A) <br />6. Project Description <br />a. Provide the brief project summary to be published in the EQB Monitor (approximately <br />50 words). <br />The Haviland Fields project is a proposed development that is anticipated to consist of 22 <br />townhomes and three multifamily residential buildings located between MN Highway 47 (St. <br />Francis Blvd NW) and County Rd 5 (Nowthen Blvd NW) in Ramsey, Anoka County, Minnesota. <br />The 35.5-acre site consists of existing institutional use and two residential properties. The two <br />existing residential buildings will be demolished. <br />b. Give a complete description of the proposed project and related new construction, <br />including infrastructure needs. If the project is an expansion, include a description of <br />the existing facility. Emphasize 1) construction and operation methods and features <br />that will cause physical manipulation of the environment or will produce wastes; 2) <br />modifications to existing equipment or industrial processes; 3) significant demolition, <br />removal, or remodeling of existing structures; and 4) timing and duration of <br />construction activities. <br />Senior Housing Partners is proposing to redevelop an approximately 35.5-acre site. See <br />Figure 1 and Figure 2 for the project location and Figure 3 for the existing site conditions. <br />Haviland Fields EAW 2 July 2023 <br />