Laserfiche WebLink
There are two existing residential buildings on site that would be demolished. The <br />redevelopment would include the following: <br />• Townhouse Units: 22 townhouse units on the northern portion of the site for a total of <br />approximately 33,000 square feet and 40 parking spaces. <br />• Three Multifamily Residential Buildings: Three residential buildings with 476 multifamily <br />units totaling approximately 113,529 square feet of gross residential area and 579 parking <br />spaces. <br />• Institutional Building: The existing institutional (church) building will remain in place. <br />The development will also include stormwater management areas throughout the site and <br />preserved green space. Utilities will be extended to the townhomes and the multifamily <br />residential buildings, including sanitary sewer, water, and electrical. Construction is <br />anticipated to begin in Spring 2024 and be completed in multiple phases over the next three <br />to four years. <br />c. Project magnitude <br />Table 1: Project Magnitude <br />Measure <br />Total Project Acreage <br />Magnitude <br />35.5 acres <br />Number and Type of Residential Units <br />Residential Building Area (square feet) <br />Institutional Building Area (square feet) <br />Other Uses - Impervious Surface (square feet) <br />Other Uses — Green Space (square feet) <br />Structure Height(s) <br />22 townhome units, 476 multifamily units <br />514,076 sq ft <br />86,038 sq ft (existing church) <br />310,703 sq ft <br />1,002,000 sq ft of green space <br />30 -55 ft for the multifamily buildings <br />d. Explain the project purpose. If the project will be carried out by a governmental unit, <br />explain the need for the project and identify its beneficiaries. <br />The project is a private development proposed to develop the existing institutional and <br />undeveloped parcel with two residential units into a residential development in order to <br />provide multifamily housing to address the housing needs in Ramsey. <br />e. Are future stages of this development, including development on any other property, <br />planned or likely to happen? ❑ Yes No <br />If yes, briefly describe future stages, relationship to present project, timeline, and plans <br />for environmental review. <br />Not applicable. <br />f. Is this project a subsequent stage of an earlier project? ❑ Yes No <br />If yes, briefly describe the past development, timeline, and past environmental review. <br />Not applicable. <br />Haviland Fields EAW 3 July 2023 <br />