My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/09/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 09/09/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2025 12:33:24 PM
Creation date
9/8/2025 11:10:44 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/09/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JO DOOOG 000 0 00 000 Ti ECMSOIO Ell X <br />ill\_1( 337 31stt Avenue South • Waite Park, MN 56387 • (320) 253--4338 • www.independenttestingtech.com <br />September 4, 2025 <br />Mr. Joe Feriancek <br />City of Ramsey <br />7550 Sunwood Drive Northwest <br />Ramsey, MN 55303 <br />RE: Proposal #09-01 <br />Dear Mr. Feriancek: <br />Proposal for Geotechnical Services <br />Countryside Estates — Additional Borings <br />Ramsey, Minnesota <br />Thank you for the opportunity to provide this proposal for geotechnical services for the <br />above referenced project in Ramsey, Minnesota. This proposal contains our understanding <br />of the project and the projected costs for its completion. <br />Description of Project <br />The project will consist of street improvements in Ramsey, Minnesota. The area of work <br />includes portions of Iguana Street, 174th Avenue and 176th Avenue. Eight (8) split -spoon <br />soil borings are proposed to depths of ten (10) feet. Our total estimated footage is eighty <br />(80) feet. A representative with ITT will mark the field boring locations. We will contact <br />Gopher One for existing utility locates prior to drilling. <br />Exploration Scope <br />The borings are planned to be performed with the use of a truck -mounted and a track - <br />mounted rig. The borings will be sampled using standard penetration test procedures so that <br />intact samples can be obtained, and "N" values recorded to help estimate soil parameters. <br />Standard penetration samples will be taken at 2 1/2-foot intervals in accordance with ASTM <br />D1586. Water level readings will be taken in the borehole following removal of the auger. <br />Pavement and aggregate base thickness determinations will be made during drilling. The <br />shallow borings will be backfilled with the auger cuttings from the drilling operations. <br />Engineering Scope <br />The completed report will include log sheets for the borings showing soil types, water levels <br />and a sketch of the boring locations as drilled. The report will include a summary of our <br />findings as well as recommendations regarding earthwork, fill and compaction, subgrade <br />GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS TESTING SPECIALTY TESTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.