Laserfiche WebLink
---V-- 7-0,iitZg- <br />September 4, 2025 <br />Proposal #09-01 <br />Countryside Estates — Additional Borings <br />Ramsey, MN <br />preparation and an R-value for bituminous pavement design. An electronic copy of the <br />report will be provided. <br />Schedule <br />The fieldwork will take approximately two (2) days. Our present schedule will permit us to <br />begin the fieldwork within 3-4 weeks of authorization to proceed. The geotechnical report <br />will be complete within two weeks of completion of the field work. <br />Fees & Payment <br />We will perform the work in accordance with the unit costs on the "Job Estimate" attached <br />to this confirmation letter. The unit costs are valid for sixty days from the date of this <br />proposal. The total cost of $4,930.00 will not be exceeded without a change in the work <br />scope and the owner's authorization. An invoice for the work performed will be mailed after <br />completion of the engineering report. <br />Remarks <br />Mr. Feriancek, we appreciate the opportunity to provide you with this proposal. If you have <br />any questions about the services we provide, please call me at (320) 253-4338. <br />Sincerely, Authorization: <br />Please proceed as described above: <br />Tyler T. Burkes, Authorized Signature <br />Assistant Geotechnical Engineer <br />Title <br />Date <br />Page 2 <br />