Laserfiche WebLink
potential repair options. The first and less costly option would beto remove as minimal a strip of <br />concrete pavement as possible and repavethe street using bituminous pavement, which would <br />require a one-day shutdown of Sunwood Drive. The second andmore expensive option would be <br />to remove two full-width concrete pavement panels and repave them with concrete, which would <br />require a full week shutdown of Sunwood Drive. Staff recommendthe first option to allow the <br />work to be done as soon as possible. <br /> <br />Councilmember Riley stated that while he would lean towards the secondoption, he supports the <br />staff-recommended first option. <br /> <br />Chairperson Olson agreed. <br /> <br />7. ADJOURNMENT <br /> <br />Chairperson Olson adjourned the meeting. <br /> <br />The regular meeting of the Public Works Committee adjourned at 6:56 p.m. <br /> <br />Respectfully submitted, <br /> <br /> <br />______________________________ <br />Bruce Westby <br />City Engineer/Public Works Director <br /> <br />Drafted by Amanda Staple <br />TimeSaver Off Site Secretarial, Inc. <br /> <br />Public Works Committee / June 17, 2025 <br />Page 4 of 4 <br /> <br />