Laserfiche WebLink
5. 1. <br />Public Works Committee <br />Meeting Date: <br />Primary Strategic Plan Initiative: <br />09/16/2025 <br />Not Applicable <br />Title: <br />Receive Updates on Improvement Projects, Studies and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />#26-01 MSA Bunker Lake Boulevard Reconstruction <br />• Bolton & Menk, Inc. preparing final plans and specifications <br />• 2026 construction proposed <br />#26-02 2026 MSA Pavement Overlay Improvements <br />• Preparing plans and specifications in-house <br />• 2026 construction proposed <br />#26-03 Carol -Rose Acres & Sports Haven Reconstructions <br />• Preparing plans and specifications in-house <br />• 2026 construction proposed <br />#26-04 Countryside Estates Reconstructions <br />• Preparing plans and specifications in-house <br />• 2026 construction proposed <br />#26-05 Flintwood Hills 2nd & 3rd Reconstructions <br />• Preparing plans and specifications in-house <br />• 2026 construction proposed <br />#26-06 Riverside West Reconstructions <br />• Preparing plans and specifications in-house <br />• 2026 construction proposed <br />#26-07 Section 01 Unplatted (S. CR 27) Reconstructions <br />• Preparing plans and specifications in-house <br />• 2026 construction proposed <br />#26-08 2026 Neighborhood Pavement Overlay Improvements <br />• Preparing plans and specifications in-house <br />• 2026 construction proposed <br />#25-02 MSA Sunwood Drive Reconstruction — CSAH 5 to Erkium Street <br />• Construction complete <br />• Punch list items are being addressed <br />#25-03 MSA Alpine Drive Reconstruction — CSAH 57 to TH 47 <br />• Construction in progress <br />• Fall completion anticipated <br />#25-04 Dickenson's Mississippi Estate Street Reconstruction <br />