• Construction in progress <br />• Fall completion anticipated <br />#25-05 High Point Street Reconstruction <br />• Construction substantially complete <br />#25-06 Sortebergs Street Reconstruction <br />• Construction substantially complete <br />#25-07 2025 Neighborhood Pavement Overlay Improvements <br />• Construction substantially complete <br />#25-08 Sunwood Drive Crosswalk Repairs <br />• Preparing plans and specifications in-house <br />• 2026 construction <br />#25-10 2025 Pavement Rejuvenation <br />• Construction almost complete...PW parking lot to be completed September 12th <br />#25-12 COR Street Lighting Improvements <br />• Connexus hopes to submit an estimate before the September PWC meeting <br />• Street lights along Ramsey Parkway and at intersections <br />#25-58 Waterfront Water Play Area Improvements <br />• Damon Farber preparing plans and specifications <br />• Utilized geotechnical soil borings from COR Mass Grading for structural design work <br />• On schedule for July 1, 2026, grand opening <br />• Will present case at October PWC meeting to discuss use of CMAR/CMAA <br />• Staff will present additional updates during the meeting <br />#24-03 2024 NE Ramsey Street Reconstruction <br />• Construction complete <br />• Closing project out this Fall <br />#24-05 Xkimo St MSA (TH47 to 142nd Avenue) Reconstruction <br />• Construction complete <br />• Contractor milled and overlayed Xkimo Street to address poor rideability <br />#24-07 2024 Neighborhood Overlay Improvements <br />• Construction complete <br />• Closing project out this Fall <br />#24-11 Alpine Drive MSA Street Reconstruction (Puma St to CSAH 83) <br />• Construction complete <br />• Closing project out this Fall <br />#24-13 Fox Ridge Estates 1st and 2nd Additions Street Reconstruction <br />• Construction complete <br />• Waiting for latest round of seed to germinate <br />#24-51 TH 47 Trail Gap Connection — 142nd Avenue to Xkimo Street <br />• Bolton & Menk prepared plans and specs for 10' trail construction <br />• Work continues with MnDOT to determine cost contributions and project schedule <br />