HE2S <br />www.ae2s.com <br />September 10, 2025 <br />Bruce Westby <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />Re: Water Treatment Plant — Construction Contingency Expense No. 10 <br />Dear Mr. Westby: <br />AE2S continues to oversee the construction of the City of Ramsey's new water treatment plant <br />(WTP). Magney Construction has completed the concrete pours for the reservoir and WTP. Subcontractors <br />have completed electrical conduit installation within the electrical room, floor slabs throughout the facility <br />and framing of the administration spaces. Subcontractors have completed all CMU block work for the <br />facility. Steel beam installation has been completed in the WTP. Site piping has been installed for sanitary, <br />storm, raw, and finished water connecting to utility in the right of way. Process piping continues to be <br />installed in the pipe gallery and is about 90% complete. Exterior architectural components including metal <br />siding and translucent wall panels have begun installation. Large mechanical equipment has been installed <br />and wired within the administration spaces and chemical rooms. AE2S' engineering team has continued to <br />coordinate with Magney and further refine the details of installation of equipment. Through those <br />investigations we have identified some items that will require adjustments. This letter is intended to outline <br />those adjustments and summarize the current project budget in order for the City to fully understand the <br />status of the project. <br />Basis for of Construction Contingency Expenses: <br />Currently twenty-two (22) requests for pricing (RFP) have been submitted to Magney. To date AE2S has <br />received pricing back on nineteen (19) of the RFP's, and has received twenty-five (25) separate Contractor <br />proposals. The Engineer has received all of the received proposals and recommends that the Owner move <br />forward with approving Construction Contingency Expense No. 10, which includes Proposal No. 034, <br />Proposal No. 35A, Proposal No. 41, and Proposal No. 44 price changes. Descriptions of the changes are <br />described below and proposals and associated initiation documents are attached for reference. If the <br />Contractor would like to include a request for extension as a result of these changes, a formal Change Order <br />request will be issued at a different time. <br />Proposal <br />No. <br />Initiation <br />Descriptio <br />Status <br />001 RFP 001 <br />002 RFP 003 <br />003 Incidental <br />Mixing Pumps Pipe <br />Upsizing <br />Admin Ceiling Grid <br />Color <br />Building Permit <br />Reimbursement <br />Upsizing Air <br />004 RFP 002 Exchange in Plate <br />Settler Room <br />005 <br />006 <br />007 <br />RFP 006 <br />RFP 005 <br />RFP 004 <br />Storm and Plumbing <br />Updates <br />Flowable Fill <br />Blower Pipe <br />Upsizing <br />$51,287.38 <br />$2,609.25 <br />$62,887.28 <br />$16,580.02 <br />$22,550.28 <br />$55,230.60 <br />Y <br />N <br />Y <br />N <br />Y <br />N <br />Y <br />Approved — <br />Construction Contingency Expense 1 <br />Approved — <br />Construction Contingency Expense 1 <br />Approved — <br />Construction Contingency Expense 2 <br />Approved — <br />Construction Contingency Expense 2 <br />Approved — <br />Construction Contingency Expense 1 <br />City and Engineer Rejected <br />Approved — <br />Construction Contingency Expense 2 <br />Advanced Engineering and Environmental Services, Inc. <br />6901 East Fish Lake Road, Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763-463-5036 <br />