4% REDS <br />www.ae2s.com <br />Proposal No. 041 — Plate Settler Flow Meter Locations: <br />To ensure accurate operation of the flow meters for the sludge pumps (SLP1 and SLP2), the Engineer is <br />proposing relocating the meters and modifying the piping to create a low point in the run, ensuring the <br />meters remain in a fully flooded section. Operating under constant full flow will improve meter accuracy, <br />assisting the City in reporting more precise waste flows from the WTP. This proposal includes the labor <br />and materials required to modify the piping and relocate the meters along with the associated electrical <br />work. <br />Proposal No. 044 — Generator Panel Feed: <br />During construction, the electrician brought up a concern with the 60-amp size of the wire to the generator <br />feed panel. Discussions with the generator manufacturer indicated that the load on the panel would be a <br />maximum of 60-amps. However, to ensure maximum capacity is met, the Engineer recommends upsizing <br />the feeder circuit to 100-amps capacity. This proposal includes the necessary labor, material, and equipment <br />to provide a higher amp feed for the generator panel and a credit for the originally scheduled wire size. <br />Summary of General Construction Contingency Costs: <br />As part of the Contractor's bid, the Owner required a $950,000 General Construction Allowance. This <br />allowance was intended to limit Contract changes due to change orders by applying general construction <br />changes to a set contingency. The allowance represents approximately 3% of the overall construction bid <br />price. For projects of this magnitude, industry standards typically see an increase in the bid price of 3% to <br />5% due to change orders, so it is expected that most of this allowance will be used by the conclusion of <br />construction. Any unused funds from the allowance will be deducted from the project's Final Payment. <br />AE2S has summarized all known construction contingency expenses below, to help the City of Ramsey <br />better understand the current contingency status. With the approval of Construction Contingency Expense <br />No. 10, the total approved expenses will total $608,734.41 of the existing $950,000.00 General <br />Construction Allowance. As construction progresses, AE2S will continue to provide cost updates and <br />coordination with City staff. <br />Expense No. <br />General Construction Contingency Amount <br />Allowance Amount: $950,000.00 <br />Expense No. 1 <br />Expense No. 2 <br />Expense No. 3 <br />Expense No. 4 <br />Expense No. 5 <br />Expense No. 6 <br />Expense No. 7 <br />Expense No. 8 <br />Expense No. 9 <br />Expense No. 10 <br />Net Expenses to Date: <br />Available Construction Contingency = <br />Percent Completed <br />$76,446.91 <br />$135,654.02 <br />$99,095.63 <br />$102,023.36 <br />$39,361.69 <br />$17,125.02 <br />$31,938.68 <br />$31,463.77 <br />$13,851.80 <br />$61,773.53 <br />$608,734.41 <br />$341,265.59 <br />64% <br />Advanced Engineering and Environmental Services, Inc. <br />6901 East Fish Lake Road, Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763-463-5036 <br />