Laserfiche WebLink
1AGNEYCON5TRUCTION <br />COMMERCIAL O INDUSTRIAL CONTRACTORS <br />1401 Park Road Chanhassen, MN 55317 <br />www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name <br />AE2S <br />Proposal <br />From <br />Noah Pundsack <br />Attention Date <br />Abby Bowman 3/19/2025 <br />E mail Phone Magney Proposal No. 034R <br />Abigail.Bowman(a�AE2S.com (763) 463-5036 Urethane Painting Modifications <br />Urgent Please comment X❑ Please review n For your information <br />Total pages, including cover: <br />2 <br />COMMENTS <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />Abby, <br />Magney Construction, Inc. is pleased to present the following quotation to furnish the necessary labor, <br />material, and equipment to provide the following coating modifications to keep the existing systems as <br />specified but add an additional coat of Acrolon 218 (3-4 mils DFT) for the Pipe Gallery and Filter Room walls <br />and ceiling. See the costs associated with change summarized below. See considerations on attached sheet <br />from Fresh Blast. <br />Labor: <br />Material: <br />Equipment: <br />Equipment: Misc. Small Tools And Equipment (10% of Labor) $ <br />Subcontractor: Fresh Blast Top Coat Urethane Acrolon 218 (3-4 Mils DFT) $ 47,329.00 <br />Subtotal $ 47,329.00 <br />General Contractor's Overhead $ 2,366.45 <br />Bond & Insurance premiums $ 745.43 <br />Lump Sum Total: $ 50,440.88 <br />'Additional Calendar Days Required for this Change (Including material lead time): I 0.0 I <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, <br />Noah Pundsack <br />Project Engineer Accepted By Date <br />Page 1 of 1 <br />