Laserfiche WebLink
Dewatering — Payment shall be made on a lump sum basis as compensation for all equipment, <br />material, and labor costs required for the installation, operation, and removal of dewatering as <br />needed for utility construction. <br />6" Concrete Walk — Payment shall be made on a per square yard basis as compensation for all <br />equipment, material, and labor costs required for the construction of six-inch (6") thick concrete <br />sidewalk. <br />Silt Fence — Payment shall be made on a per lineal foot basis as compensation for all equipment, <br />material, and labor costs required for the installation, removal, and disposal of silt fence. The <br />payment shall be made as follows: 75 percent upon installation of the silt fence, 25 percent after <br />the permanent surfaces are established and the silt fence is removed. <br />Stabilized Construction Exit - Payment shall be made on a per each basis as compensation for all <br />equipment, material, and labor costs required for the installation, maintenance, and removal of the <br />stabilized construction exit. The payment shall be made as follows: 75 percent upon installation of <br />the stabilized construction exit, 25 percent after the stabilized construction exit is removed. <br />Inlet Protection - Payment shall be made on a per each basis as compensation for all equipment, <br />material and labor costs required for the installation and maintenance of the required inlet <br />protection, as directed by the Engineer. The payment shall be made as follows: 75 percent upon <br />installation of the inlet protection, 25 percent after the permanent surfaces are established and the <br />inlet protection is removed. <br />Salvage & Respread Topsoil — Payment shall be made on a lump sum basis as compensation for <br />all equipment, material, and labor costs required to salvage and re -spread topsoil on all disturbed <br />areas. Existing site topsoil is estimated to be 6" thick. <br />Seeding — Payment shall be made on a per acre basis as compensation for all equipment, material, <br />and labor costs required for the establishment of seed in disturbed areas as directed by the <br />Engineer. Seed fertilizer, and mulch shall be compensated per the basis shown on the pay estimate. <br />Payment for seeding items shall be made as follows: 75 percent upon the installation of the pay <br />items, 25 percent after the permanent surfaces are established. <br />Rolled Erosion Prevention Category 20 — Payment shall be made on a per square yard basis as <br />compensation for all equipment, material, and labor costs required to furnish and install rolled <br />erosion prevention. Overlapping of blanket is incidental to the pay item. <br />Other Items — The cost of any additional equipment, labor, materials, tools and supplies which <br />have not been specifically identified in this section for payment, but are required to complete the <br />project per the plans and specifications shall be considered incidental to the project. <br />6 <br />