My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/23/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 09/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 2:02:01 PM
Creation date
9/22/2025 2:50:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dewatering — Payment shall be made on a lump sum basis as compensation for all equipment, <br />material, and labor costs required for the installation, operation, and removal of dewatering as <br />needed for utility construction. <br />6" Concrete Walk — Payment shall be made on a per square yard basis as compensation for all <br />equipment, material, and labor costs required for the construction of six-inch (6") thick concrete <br />sidewalk. <br />Silt Fence — Payment shall be made on a per lineal foot basis as compensation for all equipment, <br />material, and labor costs required for the installation, removal, and disposal of silt fence. The <br />payment shall be made as follows: 75 percent upon installation of the silt fence, 25 percent after <br />the permanent surfaces are established and the silt fence is removed. <br />Stabilized Construction Exit - Payment shall be made on a per each basis as compensation for all <br />equipment, material, and labor costs required for the installation, maintenance, and removal of the <br />stabilized construction exit. The payment shall be made as follows: 75 percent upon installation of <br />the stabilized construction exit, 25 percent after the stabilized construction exit is removed. <br />Inlet Protection - Payment shall be made on a per each basis as compensation for all equipment, <br />material and labor costs required for the installation and maintenance of the required inlet <br />protection, as directed by the Engineer. The payment shall be made as follows: 75 percent upon <br />installation of the inlet protection, 25 percent after the permanent surfaces are established and the <br />inlet protection is removed. <br />Salvage & Respread Topsoil — Payment shall be made on a lump sum basis as compensation for <br />all equipment, material, and labor costs required to salvage and re -spread topsoil on all disturbed <br />areas. Existing site topsoil is estimated to be 6" thick. <br />Seeding — Payment shall be made on a per acre basis as compensation for all equipment, material, <br />and labor costs required for the establishment of seed in disturbed areas as directed by the <br />Engineer. Seed fertilizer, and mulch shall be compensated per the basis shown on the pay estimate. <br />Payment for seeding items shall be made as follows: 75 percent upon the installation of the pay <br />items, 25 percent after the permanent surfaces are established. <br />Rolled Erosion Prevention Category 20 — Payment shall be made on a per square yard basis as <br />compensation for all equipment, material, and labor costs required to furnish and install rolled <br />erosion prevention. Overlapping of blanket is incidental to the pay item. <br />Other Items — The cost of any additional equipment, labor, materials, tools and supplies which <br />have not been specifically identified in this section for payment, but are required to complete the <br />project per the plans and specifications shall be considered incidental to the project. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.