My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/23/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 09/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 2:02:01 PM
Creation date
9/22/2025 2:50:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ductile Iron Pipe Watermain — Payment shall be made on a per lineal foot basis as compensation <br />for all equipment, material, and labor costs required for the installation of DIP watermain based <br />upon size. Excavation for watermain is incidental to the DIP Watermain pay item. Ductile Iron <br />Pipe size 6" or smaller shall be class 53, 8" or larger shall be class 52. Installation of tracer wire <br />per City Details and Minnesota Rural Water Association Tracer Wire Specifications is incidental <br />to the pay item. <br />Hydrant — Payment shall be made on a per each basis as compensation for all equipment, material, <br />and labor costs required for the installation of hydrants to the location shown on the exhibit. <br />Watermain Plug — Payment shall be made on a per each basis as compensation for all equipment, <br />material, and labor costs required for the installation of watermain plugs, based upon size. <br />Gate Valve & Box — Payment shall be made on a per each basis as compensation for all equipment, <br />material, and labor costs required for installing gate valves and box, based upon size. <br />Sanitary Sewer Pipe — Payment shall be made on a per lineal foot basis as compensation for all <br />equipment, material, and labor costs required for the installation of PVC sanitary sewer based upon <br />size and type. Excavation as required to install the sanitary sewer is incidental to the pay item, <br />except within drain field, which shall be paid by the excavate and dispose pay item. <br />6" Sanitary Cleanout — Payment shall be made on a per each basis as compensation for all <br />equipment, material, and labor costs required for the installation and connection of sanitary sewer <br />cleanout. Final heights adjustments to grade are incidental to the pay item. <br />Connect to existing sanitary sewer — Payment shall be made on a per each basis as compensation <br />for all equipment, material, and labor costs required for the connection to existing sanitary sewer. <br />Pipe Sewer (Sanitary) — Payment shall be made on a per lineal foot basis as compensation for all <br />equipment, material, and labor costs required for the installation of sanitary sewer pipe based upon <br />type and size. Excavation for sanitary sewer pipe installation is incidental to the pay item. <br />Installation of tracer wire per City Details and Minnesota Rural Water Association Tracer Wire <br />Specifications is incidental to the pay item. <br />Construct Sanitary Structure — Payment shall be made on a per lineal foot basis as compensation <br />for all equipment, material, and labor costs required to furnish and install sanitary manholes based <br />upon diameter. <br />Casting Assembly — Payment shall be made on a per each basis as compensation for all equipment, <br />material, and labor costs required to furnish and install sewer castings, based upon type. <br />Sanitary Sewer Pipe Plug — Payment shall be made on a per each basis as compensation for all <br />equipment, material, and labor costs required for the installation of sanitary sewer pipe plug based <br />upon type and size. <br />Clean and Video Tape Pipe Sewer — Payment shall be made on a per lineal foot basis as <br />compensation for all equipment, material, and labor costs required to clean and video tape the <br />sanitary sewer pipe. A copy of the video shall be supplied to the City. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.