Laserfiche WebLink
<br />d. Location of building, structure or parcel to which, or upon which, the sign is <br />to be attached or erected. <br /> <br />e. Position of the sign or other advertising structures in relation to the nearest <br />buildings, structures, public streets, right-of-ways and property lines, along <br />. with location and square footage areas for all existing signs on the same <br />premises. The drawing showing such position shall be prepared "to scale." <br /> <br />f. Blueprint or ink drawing of the plans and specifications, and method of <br />constructio~ .Of attachment to the building. or in the ground, inc:luding all <br />dimensions, locating all light sources, wattage, type and color of lights and <br />details of any light shields or shades. <br /> <br />g. Copy of stress s~eets and calculations; showing the structure is designated <br />for. dead loiid and wind velocity in the amount required by this and all other <br />ordinances _ of the _ City, if reqUired by the Zoning AdministI:ator or Bllilding <br />'Official. The Zoning Adn7.inistrator or Building Official may. require. <br />additional information concerning safety. <br /> <br />. h. An agreement with the City which would authorize and direct the City of <br />. Ramsey to remove the- sign and sign structure, at the expense of the <br />applicant, where maintenance is required and the maintenance is not <br />furnished, but only after a notice of sixty (60) days specifying the <br />maintenance required by the City. <br /> <br />9.12.18 <br /> <br />Permit Issuance or Denial <br /> <br />Subdivision 1. The Zoning Administrator shall issue a permit for the erection, <br />alteration, or relocation of a sign within fourteen (14) days of receipt of a completed application <br />and non-refundable application fee provided that the sign complies withalI applicable-laws and <br />regulations of the City. - <br /> <br />Subd~ 2~ When a permit is d~nied, written notice shall be provided to the <br />applicant along with a brief statement of the reasons for denial. The Zoning Administrator or <br />Building Official may suspend or revoke an issued permit for any false statement or <br />misrepresentation of fact in the application. <br /> <br />9.12.19 <br /> <br />Refunds <br /> <br />Subdivision 1. If an issued permit is withdrawn by the applicant withiri ninety <br />(90). days of issuance, and if no inspections have been made and no work authonzed by the <br />permit has been gerfonned, fifty percent (50%) of the permit fee may be refunded to the <br />applicant. <br />