Init.
<br />shall notify the Construction Manager and Architect. The Owner and the Architect, in consultation with the Construction
<br />Manager, shall thereafter agree to a corresponding change in the Project's scope and quality.
<br />§ 4.1.4 Structural and Environmental Tests, Surveys and Reports. During the Preconstruction Phase, the Owner shall
<br />furnish the following information or services with reasonable promptness. The Owner shall also furnish any other
<br />information or services under the Owner's control and relevant to the Construction Manager's performance of the Work
<br />with reasonable promptness after receiving the Construction Manager's written request for such information or services.
<br />The Construction Manager shall be entitled to rely on the accuracy of information and services furnished by the Owner
<br />but shall exercise proper precautions relating to the safe performance of the Work.
<br />§ 4.1.4.1 The Owner shall furnish tests, inspections, and reports, required by law and as otherwise agreed to by the parties,
<br />such as structural, mechanical, and chemical tests, tests for air and water pollution, and tests for hazardous materials.
<br />§ 4.1.4.2 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the
<br />site of the Project, and a written legal description of the site. The surveys and legal information shall include, as
<br />applicable, grades and lines of streets, alleys, pavements and adjoining property and structures; designated wetlands;
<br />adjacent drainage; rights -of -way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and
<br />contours of the site; locations, dimensions and other necessary data with respect to existing buildings, other improvements
<br />and trees; and information concerning available utility services and lines, both public and private, above and below grade,
<br />including inverts and depths. All the information on the survey shall be referenced to a Project benchmark.
<br />§ 4.1.4.3 The Owner, when such services are requested, shall furnish services of geotechnical engineers, which may
<br />include test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials,
<br />seismic evaluation, ground corrosion tests and resistivity tests, including necessary operations for anticipating subsoil
<br />conditions, with written reports and appropriate recommendations.
<br />§ 4.1.5 During the Construction Phase, the Owner shall furnish information or services required of the Owner by the
<br />Contract Documents with reasonable promptness. The Owner shall also furnish any other information or services under
<br />the Owner's control and relevant to the Construction Manager's performance of the Work with reasonable promptness
<br />after receiving the Construction Manager's written request for such information or services.
<br />§ 4.1.6 If the Owner identified a Sustainable Objective in Article 1, the Owner shall fulfill its responsibilities as required
<br />in AIA Document E234Tm-2019, Sustainable Projects Exhibit, Construction Manager as Constructor Edition, attached to
<br />this Agreement.
<br />§ 4.2 Owner's Designated Representative
<br />The Owner shall identify a representative authorized to act on behalf of the Owner with respect to the Project. The
<br />Owner's representative shall render decisions promptly and furnish information expeditiously, so as to avoid
<br />unreasonable delay in the services or Work of the Construction Manager. Except as otherwise provided in Section 4.2.1 of
<br />A201-2017, the Architect does not have such authority. The term "Owner" means the Owner or the Owner's authorized
<br />representative.
<br />§ 4.2.1 Legal Requirements. The Owner shall furnish all legal, insurance and accounting services, including auditing
<br />services, that may be reasonably necessary at any time for the Project to meet the Owner's needs and interests.
<br />§ 4.3 Architect
<br />The Owner shall retain an Architect to provide services, duties and responsibilities as described in AIA Document
<br />B 133Tm-2019, Standard Form of Agreement Between Owner and Architect, Construction Manager as Constructor
<br />Edition, including any additional services requested by the Construction Manager that are necessary for the
<br />Preconstruction and Construction Phase services under this Agreement. The Owner shall provide the Construction
<br />Manager with a copy of the scope of services in the executed agreement between the Owner and the Architect, and any
<br />further modifications to the Architect's scope of services in the agreement.
<br />ARTICLE 5 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES
<br />§ 5.1 Compensation
<br />§ 5.1.1 For the Construction Manager's Preconstruction Phase services described in Sections 3.1 and 3.2, the Owner shall
<br />compensate the Construction Manager as follows:
<br />AIA Document A133 — 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American Institute of Architects,"
<br />"AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:24:29 ET on
<br />10/16/2025 under Order No.4104243742 which expires on 12/31/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with
<br />the AIA Contract Documents° Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
<br />User Notes: (846025776)
<br />
|