Laserfiche WebLink
Init. <br />(Insert amount of or basis for, compensation and include a list of reimbursable cost items, as applicable.) <br />The Construction Manger's compensation for Preconstruction phase services will be a not to exceed amount of $50,000 <br />subject to the Fee Summary sheet attached to this contract. <br />§ 5.1.2 The hourly billing rates for Preconstruction Phase services of the Constmction Manager and the Construction <br />Manager's Consultants and Subcontractors, if any, are set forth below. <br />(If applicable, attach an exhibit of hourly billing rates or insert them below.) <br />See attached Fee Summary sheet for hourly billing rates. <br />Individual or Position Rate <br />§ 5.1.2.1 Hourly billing rates for Preconstruction Phase services include all costs to be paid or incurred by the <br />Construction Manager, as required by law or collective bargaining agreements, for taxes, insurance, contributions, <br />assessments and benefits and, for personnel not covered by collective bargaining agreements, customary benefits such as <br />sick leave, medical and health benefits, holidays, vacations and pensions, and shall remain unchanged unless the parties <br />execute a Modification. <br />§ 5.1.3 If the Preconstruction Phase services covered by this Agreement have not been completed within ( ) months of <br />the date of this Agreement, through no fault of the Construction Manager, the Construction Manager's compensation for <br />Preconstruction Phase services shall be equitably adjusted. <br />§ 5.2 Payments <br />§ 5.2.1 Unless otherwise agreed, payments for services shall be made monthly in proportion to services performed. <br />§ 5.2.2 Payments are due and payable upon presentation of the Construction Manager's invoice. Amounts unpaid 40 days <br />after the invoice date shall bear interest at the rate entered below, or in the absence thereof at the legal rate prevailing from <br />time to time at the principal place of business of the Construction Manager. <br />(Insert rate of monthly or annual interest agreed upon.) <br />1.5% monthly <br />ARTICLE 6 COMPENSATION FOR CONSTRUCTION PHASE SERVICES <br />§ 6.1 Contract Sum <br />§ 6.1.1 The Owner shall pay the Construction Manager the Contract Sum in current funds for the Constmction Manager's <br />performance of the Contract after execution of the Guaranteed Maximum Price Amendment. The Contract Sum is the <br />Cost of the Work as defined in Article 7 plus the Construction Manager's Fee. <br />§ 6.1.2 The Construction Manager's Fee: <br />(State a lump sum, percentage of Cost of the Work or other provision for determining the Construction Manager's Fee.) <br />The Construction Manager's Fee will be 2% applied to the Cost of the Work. <br />§ 6.1.3 The method of adjustment of the Construction Manager's Fee for changes in the Work: <br />The Construction Manager's fee will be adjusted to 2% of the final Cost of Work amount. <br />§ 6.1.4 Limitations, if any, on a Subcontractor's overhead and profit for increases in the cost of its portion of the Work: <br />§ 6.1.5 Rental rates for Construction Manager -owned equipment shall not exceed percent ( %) of the standard rental <br />rate paid at the place of the Project. <br />§ 6.1.6 Liquidated damages, if any: <br />AIA Document A133 — 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American Institute of Architects," <br />"AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:24:29 ET on <br />10/16/2025 under Order No.4104243742 which expires on 12/31/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with <br />the AIA Contract Documents° Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (846025776) <br />