Laserfiche WebLink
Water Play Detail Includes: <br />• 90 plus in -ground spray nozzles for water play <br />• Water play controls <br />• In -building manifolds <br />• 3 in -ground manifold boxes <br />• 6 or more in -ground LED lights <br />• Ground spray piping <br />• Splash pad drains and related piping <br />• Low voltage wiring and conduit for site manifold boxes <br />• Splash pad control system in mechanical room <br />• Grounding grid for ground spray assemblies and manifold boxes <br />Electrical Detail Includes: <br />• Site will be fed from a utility transformer on the north end to the utility building <br />CT Cabinet & utility meter. <br />• Service will be 400 amps at 120/ 208 volt, 3-phase with a panel board inside the <br />building to feed lighting & power. <br />• Site lighting provided by 12' high pole mounted fixtures. Quantify of 13. <br />• Catenary lighting (cable mounted lights) hanging over a portion of the plaza. <br />• Pavilion Lighting/Electrical: <br />o Linear fixtures on the underside of the pavilion ceilings <br />o Pendant mounted fixtures running down the middle of the pavilions <br />o Receptacles provided for gatherings <br />o Receptacles & lighting for pavilions fed from panel inside the building <br />Irrigation Detail Includes: <br />• Irrigation pump station with cabinet (at pond shoreline) with VFD pump <br />powered from panel inside the building. <br />• Two -wire Aclima Irritrol Controller with in -ground soil moisture <br />sensors, and various zone valves, some placed in the manifold boxes. <br />• Irrigation mainlines sufficient to serve irrigation zones beyond the 2-acre <br />waterplay project, various irrigation zones consisting of rotators, sprays <br />and drip irrigation — with one flow -controlled zone to supplement the <br />lower waterfall feature above the forebay. <br />8 <br />