My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/28/2025
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2025
>
Agenda - Council Work Session - 10/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2025 3:35:52 PM
Creation date
10/28/2025 2:19:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/28/2025
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
communication with stakeholders and for the safety of residents <br />using the adjoining park and trail areas during construction. <br />• Ongoing, the CMAR will evaluate all systems, components, and <br />materials for constructability, sustainability, economy, long-term <br />performance for use intended and schedule impacts, and provide <br />recommendations for preferred options consistent with cost and <br />schedule goals. <br />• In addition, the CMAR will identify long lead times requiring early <br />bid packages and recommend issue dates for same to meet the above <br />completion date. <br />CONSTRUCTION AND CONSTRUCTION ADMINISTRATION <br />• CMAR to provide competent, experienced full-time staff, including an <br />experienced construction field superintendent and project <br />management team to coordinate the work, maintain the progress of the <br />subcontractors, coordinate with ongoing activities and operations, and <br />provide overall direction to the project during the construction phase. <br />Establish on -site organization and levels of authority to carry out the <br />overall plans of the construction team. <br />• Demonstrate high levels of effective, proactive project leadership. <br />• Work cooperatively and constructively with members of the <br />Project Team to foster positive relationships that support positive <br />outcomes for the team members and the project. <br />• CMAR to designate a point of contact/project manager from <br />construction documents design through construction, which will <br />not be reassigned. <br />• CMAR will be contractually obligated to not reassign key staff <br />members to other projects without the City's prior written consent. <br />The City will have approval rights to any and all new personnel <br />assigned to this project. <br />• Before the beginning of construction, and in agreement with the <br />Owner, CMAR will coordinate and lead all pre -construction <br />conferences. <br />• CMAR will work with City, Owner's representative, DESIGN TEAM <br />in coordinating all RFIs, shop drawings, and any material testing. <br />• CMAR shall coordinate schedules with all City's vendors. <br />I2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.