My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/18/2025
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2025
>
Agenda - Public Works Committee - 11/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:35:12 PM
Creation date
11/13/2025 3:34:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Date
11/13/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 2. <br />Public Works Committee <br />Meeting Date: 11/18/2025 <br />Primary Strategic Plan Initiative: Not Applicable <br />Title: <br />Receive Updates on Improvement Projects, Studies and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />#26-01 MSA Bunker Lake Boulevard Reconstruction <br />. Bolton & Menk, Inc. preparing final plans and specifications <br />. 2026 construction proposed <br />#26-02 2026 MSA Pavement Overlay Improvements <br />• Preparing plans and specifications in-house <br />. 2026 construction proposed <br />#26-03 Carol -Rose Acres & Sports Haven Reconstructions <br />• Preparing plans and specifications in-house <br />• Open House held last Thursday PM <br />• 2026 construction proposed <br />#26-04 Countryside Estates Reconstructions <br />• Preparing plans and specifications in-house <br />• Open House held last Wednesday PM <br />• 2026 construction proposed <br />#26-05 Flintwood Hills 2nd & 3rd Reconstructions <br />• Preparing plans and specifications in-house <br />. Open House held last Wednesday PM <br />. 2026 construction proposed <br />#26-06 Riverside West Reconstructions <br />• Preparing plans and specifications in-house <br />• 2026 construction proposed <br />#26-07 Section 01 Unplatted (S. CR 27) Reconstructions <br />• Preparing plans and specifications in-house <br />• Open House held last Thursday PM <br />• 2026 construction proposed <br />#26-08 2026 Neighborhood Pavement Overlay Improvements <br />• Preparing plans and specifications in-house <br />• 2026 construction proposed <br />#25-02 MSA Sunwood Drive Reconstruction — CSAH 5 to Erkium Street <br />• Construction substantially complete <br />• Punch list items are being addressed <br />#25-03 MSA Alpine Drive Reconstruction — CSAH 57 to TH 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.