My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/18/2025
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2025
>
Agenda - Public Works Committee - 11/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:35:12 PM
Creation date
11/13/2025 3:34:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Date
11/13/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Construction substantially complete <br />• Punch list items are being addressed <br />#25-04 Dickenson's Mississippi Estate Street Reconstruction <br />• Construction substantially complete <br />• Punch list items are being addressed <br />#25-05 High Point Street Reconstruction <br />• Construction substantially complete <br />• Punch list items are being addressed <br />#25-06 Sortebergs Street Reconstruction <br />• Construction substantially complete <br />• Punch list items are being addressed <br />#25-07 2025 Neighborhood Pavement Overlay Improvements <br />• Construction substantially complete <br />• Punch list items are being addressed <br />#25-08 Sunwood Drive Crosswalk Repairs <br />• Preparing plans and specifications in-house <br />• 2026 construction proposed <br />#25-12 COR Street Lighting Improvements <br />• See separate case <br />• 2026 construction proposed <br />#25-58 Waterfront Water Play Area Improvements <br />• City utilities work complete (IP #25-51) <br />• Mass grading work in progress (IP #25-62) <br />• Plan preparation in progress <br />• Staff will present additional updates during the meeting <br />#24-03 2024 NE Ramsey Street Reconstruction <br />• Construction complete <br />• Closing project out <br />#24-13 Fox Ridge Estates 1st and 2nd Additions Street Reconstruction <br />• Construction complete <br />• Closing project out <br />#24-51 TH 47 Trail Gap Connection —142nd Avenue to Xkimo Street <br />• Bolton & Menk prepared plans and specs for 10' trail construction <br />• Staff will present additional updates during the meeting <br />#23-20 COR Mass Grading <br />• Construction complete <br />• Closing project out <br />#21-09 Centralized Water Treatment Plant <br />• Construction in progress <br />• City Council tour in January when operational <br />#20-11 Ramsey Gateway Highway 10 Improvements <br />• Project is substantially complete <br />• Final completion anticipated June 2026 <br />• Project webpage https://www.anokacountymn.gov/3918/Hwy-IORamsey-Blvd-Interchange <br />City of Anoka Improvement Projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.