My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/21/2025
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2025
>
Agenda - Public Works Committee - 10/21/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2025 3:08:28 PM
Creation date
11/17/2025 1:53:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/21/2025
Supplemental fields
Year
%(Da
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 2. <br />Public Works Committee <br />Meeting Date: 10/21/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Consider Recommending Full Curb and Gutter Replacement or Spot Curb and Gutter Replacement for Flintwood <br />Hills 2nd & 3rd Street Reconstructions, Improvement Project #26-05 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider recommending replacing all concrete curb and gutter or to perform spot <br />curb and gutter only where necessary due to damaged concrete for Flintwood Hills 2nd & 3rd Street <br />Reconstructions, Improvement Project #26-05. <br />Background: <br />On June 24, 2025 City Council adopted Resolution #25-139 ordering plans and specifications for the Flintwood <br />Hills lid & 3rd Street Reconstructions project. <br />The reconstruction is proposed to be a Full Reconstruction in the C1P. A Full Reconstruction typically includes <br />replacing the concrete curb and gutter, and building back a full street section. This causes for greater impacts to <br />adjacent boulevards and driveways, but all work will still be within the City -owned right of way. <br />During field review, staff has found that much of the existing concrete curb and gutter is still in useable condition. <br />With the exception of 142 nd Avenue and 142nd Circle, where all curb and gutter is proposed to be replaced <br />regardless due to high levels of exposed aggregate, approximately 31-percent of the curb and gutter needs <br />replacement due to damage. When considering 142nd Avenue and 142nd Circle, the project as a whole could <br />require 37-percent replacement. <br />A typical Full -Depth Reclamation project with spot concrete curb and gutter replacement has below 10-percent <br />curb and gutter replacement, though ADA pedestrian ramp replacements can sometime increase that percent. The <br />last similar project, Wood Pond Hills 2nd _ 5th had 7-percent replacement. <br />Not including the 13 driveways between 142nd Avenue and 142nd Circle which will be impacted, there are 92 <br />additional driveways within the project limits. <br />• 50 without any proposed curb and gutter replacement <br />• 18 with partial curb and gutter replacement <br />o Anticipate use of the driveway to be kept available <br />. 24 with replacement required across the driveway <br />o No use of the driveway during concrete cure time (1 week) <br />Other than the impact due to limiting access, replacing the concrete curb and gutter typically impacts 6 to 8 feet of <br />the boulevard behind the curb, which includes impacts to landscaping and irrigation systems. Staff is required to <br />re -design the streets, matching the existing layouts as close a practical, which adds several weeks to project <br />design. This also leads to additional stalking needs during construction. <br />Notification: <br />Notification is not required for this case. <br />
The URL can be used to link to this page
Your browser does not support the video tag.