My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/21/2025
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2025
>
Agenda - Public Works Committee - 10/21/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2025 3:08:28 PM
Creation date
11/17/2025 1:53:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/21/2025
Supplemental fields
Year
%(Da
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Time Frame/Observations/Alternatives: <br />Observations: <br />Staff determined the curb and gutter replacement by visually inspecting the curb throughout the project in <br />September of 2025. <br />Alternatives: <br />Alternative #1— Motion recommending all concrete curb and gutter be replaced as part of the Flintwood Hills 2nd <br />& 3rd Street Reconstructions, Improvement Project #26-05. <br />Alternative #2 — Motion recommending spot concrete curb and gutter be replaced per staff review as part of the <br />Flintwood Hills 2nd & 3rd Street Reconstructions, Improvement Project #26-05. <br />Alternative #3 — Motion of other. <br />Funding Source: <br />Funding for curb and gutter and other street related improvements for this project are proposed to come from TIF <br />1, per the proposed 2026 — 2035 Capital Improvement Plan. The typical difference in cost between a full street <br />reconstruction ($1,200,000 / mile) and a full -depth reconstruction (FDR) ($750,000 / mile) is approximately <br />35-percent. Because the existing pavement section is not thick enough for an FDR, staff anticipates a cost <br />difference closer to 20-percent. <br />Staff estimated the cost for removal and replacement of concrete curb and gutter alone. <br />• Spot replacement ($51/ LF) $150,250 <br />• Full replacement ($24 / LF) $192,950 <br />• Difference $42,700; 22-percent <br />The CIP estimated costs for this project are $1,168,308 ($1,015,920 Street / $152,388 Storm). <br />Recommendation: <br />Staff is seeking a recommendation from the Committee on whether all concrete curb and gutter should be <br />replaced or only the damaged curb and gutter. <br />Outcome/Action: <br />Based on Committee recommendation. <br />26-05 C&G Review <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Bruce Westby Bruce Westby 10/16/2025 02:28 PM <br />Brian Hagen Marsha Weidner 10/16/2025 02:29 PM <br />Form Started By: Joe Feriancek Started On: 10/14/2025 04:38 PM <br />Final Approval Date: 10/16/2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.