During design, staff focused on stormwater analysis to determine the proper location for curb and gutter. In <br />general, the location of curb and gutter will match existing locations, though the overall amount was able to be <br />reduced. The project will include replacing the existing street crossing culverts with concrete culverts. In the areas <br />with curb and gutter, catch basin inlets in the curb line will replace bituminous flumes, which will be easier and <br />more cost efficient to maintain. <br />Restoration of the impacted boulevards will include a minimum of 4-inches topsoil and hydroseed with a <br />residential turf seed mix. In areas of steep side slopes, erosion control blanket will be used. Minor grading of the <br />swales to match into the new culverts is proposed. Several hundred feet of the Tonto Street swale south of 179th <br />Lane (CR 27) is proposed to be slightly modified to alleviate standing water after rain events. Additionally, minor <br />grading in the ditch and culvert cleaning will be performed to remove standing water on the south side of 178 th <br />Lane. Per typical reconstruction projects, boulevard and driveway impacts are anticipated to occur within 6 to 8 <br />feet behind the existing edge of pavement and bituminous curbing. <br />Municipal utilities do not exist within the project area, extension of municipal utilities to this subdivision are not <br />proposed as it is outside of the 2040 MUSA. <br />Preliminary Schedule Remaining <br />• Council approves plans and specifications / authorizes ad for bids <br />o January 13, 2026 <br />• Staff Receives Bids <br />o Week of February 9th or 16th, 2026 <br />• Council Awards Contract to the Lowest Responsible Bidder <br />o February 24, 2026 <br />• Contractor Begins Construction <br />o Spring / Summer 2026 <br />• Contractor Substantially Complete Construction <br />o New bituminous pavement in -place, topsoil and seed in -place <br />o August 28, 2026 <br />• Contractor Final Completion <br />o Verify final restoration; punch list created <br />o September 30, 2026 <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case <br />to prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding <br />software used by the City of Ramsey. This ensures all bidders are bidding off the same set of plans, and all <br />bidders are notified of any plan revisions (addenda) issued during the bidding process. Attached is the title sheet <br />showing the scope of the improvements, as well as a plan sheet showing the typical sections, which includes <br />information on the proposed pavement section. Plans are available upon request from the City Engineer. <br />Notification: <br />Notification is not required for this case. Staff will update the project webpage, to keep residents informed on the <br />progress of the project. <br />Time Frame/Observations/Alternatives: <br />Timeframe: <br />Staff anticipates up to 15 minutes will be required to present this case and respond to questions. <br />Observations: <br />The public open house was held on November 13, 2025 in the Alexander Ramsey Room, at the Municipal Center. <br />Comments received included verifying turn radius are large enough at the tee intersections. Additionally, <br />residents commented on a culvert under Tonto Street south of 179th Avenue which staff had not been able to <br />locate. The resident located the culvert in the field for staff, and the culvert replacement was added to the plans. <br />