My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/13/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 01/13/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2026 8:44:19 AM
Creation date
1/15/2026 9:07:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/13/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESQ <br />2355 Polaris Lane North <br />Suite 120 <br />Plymouth, MN 55447 <br />4. Third party inspections, reports, etc., of an official nature that would be required by the <br />Building Codes and/or local AHJ. <br />5. Attendance of any zoning or development board meetings or meetings with the AHJ. <br />6. Any services not specifically identified as being included are noted to be excluded from <br />this proposal. <br />ESi will invoice for its work on a fixed fee basis according to the budget costs outlined in the <br />Scope Summary. Any additional costs beyond the fixed fee must be pre -approved in writing by <br />the City of Ramsey. <br />SCOPE SUMMARY <br />SERVICE <br />SCOPE OF WORK PHASE <br />A. INITIAL SITE VISITS <br />B. DOCUMENT OF EXISTING CONDITIONS <br />PHASE TOTAL: <br />DESIGN PHASE <br />A. ADA Exterior Accessible Route <br />B. HVAC <br />C. ADA Period Toilet <br />D. Assess Floor Bearing Points <br />PHASE TOTAL: <br />PROJECT TOTAL: <br />NOTES <br />This proposal for the Design Phase only and does not include services after <br />Construction Documents are provided to the city for cost estimating and/or bidding. <br />Offered by Engineering Systems Inc (ESi): Accepted by (Client): <br />Engineering Systems Inc. <br />BUDGET COST <br />23 June 2015 <br />(date) (signature) (date) <br />$5,000 <br />$3,000 <br />$8,000 <br />$12,500 <br />$6,000 <br />$10,000 <br />$1,500 <br />$30,000 <br />$38,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.