My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/27/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 01/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 1:28:33 PM
Creation date
1/28/2026 1:43:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/27/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
under 3.5-inches of new bituminous pavement. Because the total pavement section is gaining thickness, <br />approximately 2-inches of underlying sand base material must be hauled off site. <br />The new concrete curb and gutter is proposed to match the elevation and location of the existing curb and gutter <br />as close as practical. Since driveway locations are known, curb cuts will be added. Driveways and boulevards will <br />be impacted, typically 6 to 8 feet behind the curb and gutter. In some areas, driveway match -ins must go further <br />than 8 feet back. However, all work is proposed to occur within the right-of-way. <br />Restoration of the impacted boulevards will include a minimum of 4-inches of topsoil and hydroseed with a <br />residential turf seed mix. <br />Municipal utilities exist throughout the project area. Repairs to pipes are not proposed with this project. All <br />castings and valve boxes within the pavement and curb will need to be adjusted to match the new bituminous <br />pavement elevation. <br />Preliminary Schedule Remaining <br />• Staff Receives Bids <br />o March 3, 2026 <br />• Council Awards Contract to the Lowest Responsible Bidder <br />o March 10, 2026 <br />• Contractor Begins Construction <br />o Spring / Summer 2026 <br />o Detailed construction schedule will not be known until the project is awarded, and a pre -construction <br />meeting is held with the contractor. <br />• Contractor Substantially Completes Construction <br />o New bituminous pavement in -place, topsoil and seed in -place <br />o August 28, 2026 <br />• Contractor Final Completion <br />o Verify final restoration; punch list created <br />o October 2, 2026 <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case <br />to prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding <br />software used by the City of Ramsey. This ensures all bidders are bidding oft the same set of plans, and all <br />bidders are notified of any plan revisions (addenda) issued during the bidding process. Attached is the title sheet <br />showing the scope of the improvements, as well as a plan sheet showing the typical section, which includes <br />information on the proposed pavement section. Plans are available upon request from the City Engineer. <br />Notification: <br />If City Council approves plans and specifications and authorizes advertising for bids, bids will be advertised on <br />Friday, January 30, and again on Friday, February 6, 2026, in the City's official newspaper, the Anoka Union <br />Herald. Plans are also advertised on the QuestCDN website, which directly notifies contractors interested in <br />bidding these types of projects. <br />Additionally, letters will be mailed to property owners with updates on the project status. Engineering staff <br />maintains City Improvement webpages with the most current project information. This can be found on the city <br />website, Engineering Department page. <br />Time Frame/Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.