Bunker Lake Boulevard <br />January 7, 2026 <br />Page 2 of 2 <br />Revision 4 (October 10. 2025 <br />After further discussions with the County, the City decided to move the sidewalk outside of the ROW <br />and obtain an easement from Kwik Trip. We revised the boulevard and sidewalk on the layout and also <br />created an easement description & exhibit. <br />Revision 5 (December 19. 2025 <br />The final revision included eliminating a portion of the improvements within the Armstrong Boulevard <br />ROW. Previously planned pedestrian curb ramps and associated curb repairs were removed from the <br />project. <br />ADDITIONAL FEES <br />Most of the revisions occurred during the final design process, requiring changes to the project plans. <br />The layout exhibits were also created as a means for depicting the revisions and for sharing with review <br />agencies and project partners. <br />The revisions resulted in 32 hours of Project Manager/Land Surveyor time and 128 hours of drafting <br />time. This equates to approximately 6 hours of Project Manager time and 26 hours of drafting time per <br />revision. We are requesting additional services in the amount of $27,808.00. The total contract amount <br />would then be $146,155.00. <br />We have included attachments to depict the progression of revisions for reference. <br />If there are any questions, please call me at (651) 968-7760. <br />Sincerely, <br />BOLTON & MENK, INC. <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />CC: Bruce Westby, Public Works Director / City Engineer <br />Attachments: Layout Exhibits and Easement Document <br />