Laserfiche WebLink
• Construction complete <br />• Closing project out <br />#24-13 Fox Ridge Estates 1st and 2nd Additions Street Reconstruction <br />• Construction complete <br />• Closing project out <br />#24-51 TH 47 Trail Gap Connection — 142nd Avenue to Xkimo Street <br />• Bolton & Menk prepared draft construction plans and specifications for 10' pedestrian trail <br />• Plans need updating per final grading of Complete Auto and Lightbridge Academy developments <br />• MnDOT proposes to construct this trail with their 2028 TH 47 mill and overlay project <br />#21-09 Centralized Water Treatment Plant <br />Construction substantially complete <br />Distributing treated water to water supply distribution system <br />City Council tour scheduled for February 24th <br />#20-11 Ramsey Gateway Highway 10 Improvements <br />• Project complete <br />• Punch list items are being addressed <br />City of Anoka Improvement Projects & Studies <br />Ferry Street (Trunk Highway 47) Grade Separation of BNSF Rail Crossing <br />• City -led project <br />• $45M in bonds authorized October 2020 <br />• 2028 construction anticipated <br />Highway 47 Corridor Plan — Garfield St to Bunker Lk Blvd <br />• Improvements proposed to address intersection operations and safety, providing safe pedestrian and <br />bicyclist routes, providing safe driveway access, and accommodating future growth <br />• Proposing 3-lane design with center two-way turn lane (CTWTL) <br />• Received regional solicitation funds for 2027 construction <br />• Permanent signal system at McKinley Street <br />• Construction proposed for 2027 - 2029 <br />• Website; https://www.anokaminnesota.com/836/Trunk-Hwy-47-Corridor-BNSF-Railroad-Grad <br />City of Elk River Improvement Projects & Studies <br />Highway 10 Corridor Improvements - Highway 169 to city boundary with Ramsey <br />• Corridor planning project <br />• Received $1.6M from MnDOT Corridors of Commerce Readiness Advancement program for preliminary <br />design and environmental analysis <br />Anoka County Improvement Projects <br />9 2027 Sunfish Lake Blvd. reconstruction proposed north of Bunker Lake Blvd. <br />