Laserfiche WebLink
H+U CONSTRUCTION ESTIMATED GENERAL CONDITIONS <br />RAMSEY WATERFRONT PARK <br />PLAN REPRODUCTION <br />1 <br />LS <br />$1,500 <br />$1,500 <br />MOBILIZE/DEMOBILE TRAILER <br />2 <br />EA <br />$2,500 <br />$5,000 <br />TEMP STORAGE <br />5 <br />MO <br />$600 <br />$3,000 <br />SAFETY & OSHA <br />5 <br />MO <br />$500 <br />$2,500 <br />GENERATOR RENTAL <br />5 <br />MO <br />$2,500 <br />$12,500 <br />TEMP WATER - USAGE <br />5 <br />MO <br />$225 <br />$1,125 <br />DRINKING WATER <br />5 <br />MO <br />$40 <br />$200 <br />TEMP HEATERS/FANS RENTAL <br />1 <br />LS <br />$15,000 <br />$15,000 <br />TEMP HEATERS FUEL <br />4000 <br />GL <br />$3 <br />$12,000 <br />FROST BLANKETS <br />1 <br />LS <br />$1,500 <br />$1,500 <br />GROUND THAW RENTAL AND FUEL <br />2 <br />MO <br />$10,000 <br />$20,000 <br />TEMP TOILETS <br />5 <br />MO <br />$400 <br />$2,000 <br />CONSTRUCTION FENCING <br />1 <br />LS <br />$8,500 <br />$8,500 <br />CONSTRUCTION SIGNAGE <br />1 <br />LS <br />$2,500 <br />$2,500 <br />SNOW REMOVAL <br />1 <br />LS <br />$1,000 <br />$1,000 <br />MISC EQUIP RENTAL <br />5 <br />MO <br />$500 <br />$2,500 <br />EXPENDABLE TOOLS/SUPPLIES <br />5 <br />MO <br />$1,000 <br />$5,000 <br />SKID STEER/ATTACHMENT RENTAL <br />5 <br />MO <br />$2,750 <br />$13,750 <br />MEDICAL SUPPLIES <br />5 <br />MO <br />$100 <br />$500 <br />TEMP FIRE PROTECTION <br />5 <br />MO <br />$250 <br />$1,250 <br />GENERAL & PROFESSIONAL LIABILITY INSURANCE <br />0.75% <br />LS <br />$3,625,168 <br />$27,189 <br />FINAL CLEANUP <br />1 <br />LS <br />$10,000 <br />$10,000 <br />TRASH REMOVAL <br />5 <br />MO <br />$1,200 <br />$6,000 <br />POSTAGE/SHIPPING <br />5 <br />MO <br />$250 <br />$1,250 <br />ROMTEC CHANGE <br />1 <br />LS <br />$440 <br />$440 <br />CORE DRILLING OF STONES <br />12 <br />EA <br />$1,000 <br />$12,000 <br />CONCRETE REPAIRS <br />1 <br />LS <br />$5,000 <br />$5,000 <br />BOLLARDS AT ELECTRICAL PAD <br />4 <br />EA <br />$1,250 <br />$5,000 <br />Total General Conditions: $178,204 <br />*The General Conditions estimate above assumes approximately 5 months of construction, beginning in February <br />2026. <br />