My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/10/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 02/10/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 2:43:25 PM
Creation date
2/13/2026 1:45:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/10/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Waterfront Waterplay N <br />ID <br />Task Name <br />Duration <br />Start <br />Finish <br />Predecessors <br />ResiBaseline <br />Nan <br />Start <br />Half 1, 2026 Half 2, 2026 <br />1 F M A M 1 1 A S O N D <br />Half 1, 2027 <br />1 F M A M <br />1 <br />THE WATERFRONT WATERPLAY <br />NA <br />0% Romtec Footing Excavation <br />0% Romtec Footings and <br />0% Romtec Water and <br />0° Romtec - Backfill Foundations <br />0% t Romtec Underground <br />0% Ls Romtec Masonry <br />0% Romtec Roof <br />0% Romtec Interior <br />0% i► Romtec <br />0% E1 Romtec <br />0% ATI Romtec <br />0% Romtec <br />0% j <br />0% 1 Splash Pad Pioipg <br />Foundations <br />Sewer Line <br />Plumbing <br />Walls and MEP RI <br />Slab <br />Interior Finishes <br />Exterior Finishes <br />MEP Finishes <br />Partitions and Accessories <br />Romtec Final Cleaning <br />and Electrical <br />R/I Piping/Electrical <br />Pad Work in Romtec <br />Splash Pad Devicing/Testing/Programming <br />Backfill <br />Base <br />Stones - Splashpad Area <br />R/I <br />in Splashpad Islands <br />ng Confirmations - Splashpad Area <br />Stones outside of Splashpad Area <br />Topsoil outside of Splashpad Area <br />Pad Concrete <br />Other Site Concrete <br />Posts and Hammock Posts <br />Install (3) <br />Site Amenity Install <br />R/I and Footings <br />Enclosure Install <br />Landscaping <br />Project Completion <br />2 <br />Romtec Building NA <br />3 <br />Romtec Footing Excavation 3 days Mon 3/2/26 Wed 3/4/26 NA <br />4 <br />Romtec Footings and Foundations 10 days Thu 3/5/26 Wed 3/18/263 NA <br />5 <br />Romtec Water and Sewer Line 10 days Thu 3/5/26 Wed 3/18/26 NA <br />6 <br />Romtec - Backfill Foundations 2 days Thu 3/19/26 Fri 3/20/26 5 NA <br />7 <br />Romtec Underground Plumbing 3 days <br />Mon 3/23/26Wed 3/25/26 NA <br />8 <br />Romtec Masonry Walls and MEP RI 20 days <br />Thu 3/26/26 Wed 4/22/26 NA <br />9 <br />Romtec Roof 10 days Thu 4/23/26 Wed 5/6/26 8 NA <br />10 <br />Romtec Interior Slab 2 days Thu 5/7/26 Fri 5/8/26 9 NA <br />11 <br />Romtec Interior Finishes 15 days Mon 5/11/26Fri 5/29/26 NA <br />12 <br />Romtec Exterior Finishes 15 days Mon 5/11/26Fri 5/29/26 NA <br />13 <br />Romtec MEP Finishes 5 days Tue 6/2/26 Mon 6/8/26 NA <br />14 <br />Romtec Partitions and Accessories 5 days Tue 6/9/26 Mon 6/15/2613 NA <br />15 <br />Romtec Final Cleaning 2 days Thu 6/25/26 Fri 6/26/26 NA <br />16 <br />Splash Pad Piping and Electrical 62 days Mon 4/6/26 Tue 6/30/26 NA <br />0% <br />0 <br />0% Earthwork <br />Splash Pad <br />0 l•'I Splash <br />0% iI <br />17 <br />Splash Pad R/I Piping/Electrical 15 days Mon 4/6/26 Fri 4/24/26 NA <br />18 <br />Splash Pad Work in Romtec 10 days Fri 5/15/26 Thu 5/28/26 NA <br />19 <br />Splash Pad Devicing/Testing/Programm 15 days 'Wed 6/10/26Tue 6/30/26 NA <br />20 <br />Earthwork 77 days Mon 3/2/26 Tue 6/16/26 NA <br />0% M Romtec <br />0% i Romt <br />0% <br />0% <br />0% <br />0% <br />0% <br />ooting Excavation <br />c Foundation <br />Place Gravel <br />Place <br />® Area Drain <br />zr Place Topsoil <br />0% Grad <br />0% Place <br />0% Place <br />ncrete <br />21 <br />Romtec Footing Excavation 3 days Mon 3/2/26 Wed 3/4/26 NA <br />22 <br />Romtec Foundation Backfill 2 days Thu 3/19/26 Fri 3/20/26 NA <br />23 <br />Place Gravel Base 5 days Fri 5/1/26 Thu 5/7/26 17 NA <br />24 <br />Place Stones - Splashpad Area 10 days Fri 5/8/26 Thu 5/21/26 23 NA <br />25 <br />Area Drain R/I 2 days Fri 5/15/26 Mon 5/18/26 NA <br />26 <br />Place Topsoil in Splashpad Islands 5 days Mon 5/11/26Fri 5/15/26 NA <br />27 <br />Grading Confirmations - Splashpad Arez 3 days Fri 5/22/26 Tue 5/26/26 24 NA <br />28 <br />Place Stones outside of Splashpad Area 10 days Wed 5/27/26Tue 6/9/26 27 NA <br />29 <br />Place Topsoil outside of Splashpad Area5 days Wed 6/10/26Tue 6/16/26 28 NA <br />30 <br />Site Concrete 28 days Fri 5/15/26 Tue 6/23/26 NA <br />0% <br />0% <br />0% Fire <br />0% Can <br />0% <br />0% <br />0% if Site <br />0% rf <br />0% <br />Splash <br />Site Footings <br />% <br />it R/I <br />nary Light <br />Pavillion <br />z1 <br />Lighting <br />Trash <br />31 <br />Splash Pad Concrete 15 days Wed 5/27/26Tue 6/16/26 27 NA <br />32 <br />Site Footings 5 days Fri 5/15/26 Thu 5/21/26 NA <br />33 <br />Other Site Concrete 5 days Wed 6/17/26Tue 6/23/26 31 NA <br />34 <br />Fire Pit R/I 3 days Wed 4/15/26Fri 4/17/26 NA <br />35 <br />Cantenary Light Posts and Hammock Post3 days Mon 4/20/26Wed 4/22/2634 NA <br />36 <br />Pavillion Install (3) 10 days Fri 5/22/26 Thu 6/4/26 32 NA <br />37 <br />Site Amenity Install 15 days Thu 6/11/26 Wed 7/1/26 NA <br />38 <br />Site Lighting R/I and Footings 10 days Wed 4/15/26Tue 4/28/26 NA <br />39 <br />Trash Enclosure Install 5 days Thu 5/21/26 Wed 5/27/26 NA <br />40 <br />Landscaping 25 days Thu 5/28/26 Wed 7/1/26 NA <br />z:f <br />0% z <br />41 <br />Project Completion 1 day IWed 7/1/26 Wed 7/1/26 NA <br />Page 1 of 1 Tue 1/20/26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.