My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/10/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 02/10/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 2:43:25 PM
Creation date
2/13/2026 1:45:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/10/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clarifications &Assumptions <br />giff <br />Waterfront Park <br />City of Ramsey <br />February 2, 2026 <br />Purpose: <br />Provide clarifications and assumptions, if any. <br />Clarifications, Assumptions, Exclusions: <br />H+U CONSTRUCTION <br />1. The Guaranteed Maximum Price estimate is intended to provide a GMP for the overall <br />project based on the Construction documents and clarifications listed within this <br />Attachment. It is not intended to guarantee the cost of any individual subcontract or <br />specific line item. <br />2. The Owner/Contractor Agreement provision and this Exhibit take precedence over any <br />conflicting provisions in the Contract Documents. <br />3. This estimate does not provide for any Owner or Design contingencies. <br />4. Building Permit cost is included as an allowance. <br />5. Sales tax is included. <br />6. The schedule is contingent upon receiving the appropriate building permits prior to <br />the commencement of construction. <br />7. The GMP includes costs for coring qty 12 rocks for spray heads. <br />8. This proposal includes a Construction Contingency for the sole and exclusive use of <br />H+U Construction to cover those costs considered reimbursable as the Cost of the <br />Work but not otherwise the basis of an Owner Change Order. The construction <br />contingency excludes drawing changes which shows additional scope, details adding <br />cost to the project or any other document changes. Unused contingency savings will <br />accrue 100% to the Owner per the executed A133 between the City of Ramsey & <br />H+U Construction. <br />9. The pricing for alternate #2 is included in the GMP. <br />Assumptions: <br />1. Utilities will be installed by service providers in May 2026. <br />Exclusions: <br />1. Hazardous material removal <br />2. Soil Corrections - It is assumed that excavated materials can be reused for backfill and <br />soils on -site are sufficient to support the project elements. <br />3. Building Commissioning <br />4. Furniture, fixtures, and the Romtec building have been procured by the Owner under <br />separate contracts. H+U's GMP includes costs for installing these items. <br />H+U Construction I 5555 West 78th Street I Suite A I Minneapolis, MN 55439 <br />Phone: 952 831 5408 I Email: info@hu-construction.com I Web: hu-construction.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.