Laserfiche WebLink
Relevant Project Experience <br />Lynwood Development, Ramsey, MN <br />2022 <br />New townhouse development. Nick managed the project and provided materials testing during utility installation an <br />concrete and bituminous placement. <br />Springhill Suites, St. Paul, MN 2018-2019 <br />This project consisted of the construction of a new 205,000 sq. ft. 10 story hotel. including a 3 level- integrated <br />parking structure in the Lowertown area of St. Paul. Nick worked closely with Weis Builders providing full-time <br />special inspections and materials testing on site. He provided full-time observations for 85 drilled caisson's, <br />materials testing of soils, concrete, and masonry, and performed all reinforcing steel and poste -tensioned deck <br />inspections. Nick also worked closely with the structural engineer of record providing elongation measurements <br />and reporting during the post -tensioning process. <br />Chanhassen West Water Treatment Plant, Chanhassen, MN 2018 <br />New construction of a high zone pressure water treatment facility on the western side of Chanhassen. This Plant <br />now serves as one of two treatment facilities to remove naturally occurring manganese and iron deposits from the <br />city's deep well water. As Engineering Technician, worked closely with WSB inspector and City of Chanhassen <br />staff. <br />Provided material testing of the work along with material sampling and documentation in compliance with the <br />project requirements. This project required a mass soil correction which required multiple excavation observations <br />to ensure proper compaction requirements were met for the replacement material. <br />Xcel Energy Colby Lake Lateral Replacement Project, Woodbury, MN 2018 <br />This project consisted of the abandonment of a 6" gas main along Valley Creek Road for approximately 2 miles in <br />Woodbury, MN being replaced with a new 12" line. Nick worked closely with WSB, Bolton and Menk, and Xcel <br />Energy providing materials testing and compaction testing of backfill materials and flowable fill materials for deep <br />excavations. This project also consisted of the paving of a new bike trail over the pipeline, and spot replacements <br />of concrete paving and curb and gutter. <br />February, 2026 <br />