My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/24/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 02/24/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 4:21:20 PM
Creation date
3/6/2026 9:40:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/24/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Relevant Project Experience <br />Main Avenue Reconstruction, Albertville, MN <br />2025-Present <br />AET provided geotechnical services and is providing construction materials testing for the reconstruction of Main <br />Avenue in Albertville, MN. This project includes State -Aid funding and AET is assisting with documentation and <br />materials summary reports throughout the project for state aid requirements. Construction is anticipated to be <br />completed in 2026. <br />Ramsey Water Treatment Plant, Ramsey, MN <br />2023-2025 <br />Nick served as the project manager and also provided on -site observations for the construction of a new water <br />treatment plant for the City of Ramsey. AET provided materials testing and special inspections for the construction <br />of a new water treatment plant in the City of Ramsey. AET's scope of work included excavation observations, soils <br />testing, concrete and rebar observations and testing, and structural steel and welding inspections. Throughout the <br />project AET has provided experienced technicians to perform these observations and testing. <br />Nightingale Street Roundabouts, Andover, MN 2025 <br />Nick served as the project manager for the construction of two roundabouts near Crosstown Boulevard and <br />Nightingale Street in Andover, MN. AET technicians and field engineers provided on site observations and <br />materials testing. Construction took place in the 2025 construction season and included soils, concrete, and <br />bituminous testing. AET also provided state aid documentation for the project. <br />Greenfeld Road , Greenfield, MN 2024-2025 <br />Nick managed the geotechnical and materials testing for this project. The project consisted of the regrading and <br />paving of an existing gravel road that included extensive amounts of organic soils that were stabilized using soil <br />corrections and geogrid to build the road section. AET provided recommendations for the soil corrections during <br />the geotechnical phase and provided technicians and engineers for onsite observations and testing during the <br />construction phase. <br />Andover Crossing, Andover, MN 2022 <br />New mixed use development including grading work, utility installation, concrete, and bituminous placement. <br />Performed testing on soils, concrete, and bituminous materials. <br />February, 2026 AET <br />
The URL can be used to link to this page
Your browser does not support the video tag.