Funding Source: <br />Funding for this improvement is proposed to come from Pavement Management Funds and Storm Water Utility <br />Funds. <br />On February 11, 2026 a total of eight (8) bids were received, opened, and tabulated, and the following bids were <br />found to comply with the advertisement for bids. <br />Contractor <br />North Valley, Inc. <br />Knife River Corporation — North Central <br />Park Construction Company <br />GMH Asphalt Corporation <br />Valley Paving, Inc. <br />Asphalt Surface Technologies Corp. <br />Dresel Contracting, Inc. <br />Northwest <br />Engineer's Estimate <br />Total Bid <br />$1,659,058.61 <br />$1,673,464.50 <br />$1,724,039.10 <br />$1,815,551.64 <br />$1,877,740.80 <br />$1,941,205.30 <br />$2,202,420.69 <br />$2,318,659.45 <br />$2, 061,186.00 <br />The bid of North Valley, Inc. of Nowthen, Minnesota, in the amount of $1,659,058.61 for the total bid of said <br />improvements in accordance with the approved plans and specifications and advertisement for bids, is the lowest <br />responsible bidder. Adding indirect costs in the amount of 23-percent brings the total project costs to <br />$2,040,642.09 <br />The bid is 20-percent lower than the engineer's estimate, primarily due to lower than anticipated excavation, <br />aggregate, and earthwork prices. <br />Funding Source Breakdown: <br />Funding Source <br />Pavement Management <br />Storm Sewer Utility <br />Project Total <br />Construction Costs <br />$1,585,200.75 <br />$73,857.86 <br />$1,659,058.61 <br />Indirect Costs <br />$364,596.17 <br />$16,987.31 <br />$381,583.48 <br />Total Cost <br />$1,949,796.92 <br />$90,845.17 <br />$2,040,642.09 <br />Bolton & Menk has submitted a proposal for construction staking and as -built survey of said improvements for <br />the total not -to -exceed amount of $64,116.00. Construction staking is included in the indirect costs, and is <br />proposed to be paid for by Pavement Management and Storm Sewer Utility funds. <br />The CIP level estimate had a total estimated project cost of $2,618,136, which includes street costs of $2,276,640 <br />and storm sewer costs of $341,496. The final project costs may change depending upon bid prices and actual <br />construction quantities. <br />City staff proposes to administer and inspect construction. Plans and specifications were prepared in-house as part <br />of staff's normal duties. <br />Recommendation: <br />Staff recommends adopting Resolution #26-048 accepting bids and awarding a contract to North Valley, Inc. for <br />the total amount of $1,659,058.61 for Countryside Estates Street Reconstructions, Improvement Project #26-04. <br />Outcome/Action: <br />Motion to adopt Resolution #26-048 accepting bids and awarding a contract to North Valley, Inc. for the total <br />amount of $1,659,058.61 for Countryside Estates Street Reconstructions, Improvement Project #26-04. <br />