Laserfiche WebLink
CC Regular Session <br />Meeting Date: <br />02/24/2026 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />7. 2. <br />Title: <br />Adopt Resolution #26-049 Accepting Bids and Awarding Contract for Section 01 Unplatted Street <br />Reconstructions, Improvement Project #26-07 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #26-049 accepting bids and awarding a contract to North Valley, <br />Inc. for the total amount of $1,189,848.87 for Section 01 Unplatted Street Reconstructions, Improvement Project <br />#26-07. <br />Background: <br />The 2026 — 2035 Capital Improvement Plan (CIP) identifies the streets within the Section 01 Unplatted south of <br />CR 27 subdivision for street reconstruction in 2026. A street segment summary for the project is attached to this <br />case. <br />Project History <br />• April 22, 2025, the Ramsey City Council adopted Resolution #25-082, accepting and awarding a proposal <br />to Bolton & Menk for topographic survey of the project area. <br />• May 13, 2025, the Ramsey City Council adopted Resolution #25-101, accepting and awarding a proposal <br />to Independent Testing Technologies for a geotechnical report of the project area. <br />• June 17, 2025, the Ramsey Public Works Committee recommended City Council order plans and <br />specifications for said improvements. <br />• June 24, 2025, the Ramsey City Council adopted Resolution #25-141, ordering plans and specifications for <br />said improvements. <br />• November 13, 2025, staff held a public open house for property owners impacted by these improvements. <br />The open house was attended by 5 residents. <br />• December 16, 2025, the Ramsey Public Works Committee recommended City Council approve plans and <br />specifications and authorize advertisement for bids for said improvements. <br />• January 13, 2026, the Ramsey City Council adopted Resolution #26-010 approving final plans and <br />specifications and authorizing advertisement for bids for said improvements. <br />• February 12, 2026, Ramsey staff publicly opened bids for said improvements. <br />Project Scope <br />This project proposes to reconstruct the streets within the Section 01 Unplatted subdivision, generally located <br />west of CSAH 7 and south of 179th Lane (CR 27). The streets are 24-foot wide with a combination of rural and <br />urban with bituminous curbing. Much of the bituminous curbing appears to be placed to address localized drainage <br />within the subdivision, and eventually runs to flumes and swales. The streets total 1.44 miles in length. Drainage <br />is handled through ditches adjacent to the streets, and runs to ponds and wetlands, which exist throughout the <br />project area. <br />The streets within Section 01 Unplatted were constructed in 1980 and received an overlay in 1999. GPR data <br />shows an average pavement section of 6.6-inches, including 4.0-inches of bituminous and 2.6-inches of aggregate <br />base. <br />The reconstruction of the streets is generally proposed to be a Full -Depth Reclamation (FDR). Bituminous <br />